Do you have any question about this error?
Message type: E = Error
Message class: GP - FI-SL and CO planning
Message number: 114
Message text: Version & does not permit planning
Version &V1& is not supported for planning data.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Maintain the planning indicator in table T894.
Error message extract from SAP system. Copyright SAP SE.
GP114
- Version & does not permit planning ?The SAP error message GP114, which states "Version & does not permit planning," typically occurs in the context of SAP's planning functions, particularly in the SAP Integrated Business Planning (IBP) or SAP Business Planning and Consolidation (BPC) modules. This error indicates that the version you are trying to use for planning is not set up to allow planning activities.
Cause:
- Version Configuration: The version you are trying to use may not be configured to allow planning. In SAP, versions can be set up with different statuses, and some may be designated as "read-only" or "not for planning."
- Authorization Issues: The user may not have the necessary authorizations to perform planning activities in the specified version.
- Version Status: The version might be in a status that does not permit planning, such as "locked" or "closed."
Solution:
Check Version Settings:
- Go to the version configuration in your SAP system (transaction code may vary based on the module).
- Ensure that the version is set to allow planning. This typically involves checking the version's properties and ensuring that the "Planning" option is enabled.
Change Version Status:
- If the version is locked or closed, you may need to change its status to "open" or "active" to allow planning activities.
User Authorizations:
- Verify that the user has the necessary authorizations to perform planning in the specified version. This may involve checking user roles and permissions in the SAP system.
Consult Documentation:
- Refer to the SAP documentation or help resources for specific instructions on managing versions in your particular SAP module (IBP, BPC, etc.).
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with SAP support for further assistance.
Related Information:
By following these steps, you should be able to resolve the GP114 error and successfully perform planning activities in the desired version.
Get instant SAP help. Start your 7-day free trial now.
GP113
Create valid master data for &.
What causes this issue? The system could not determine any valid master data in the planning period for dimension &V1&.System Response The s...
GP112
Select at least one and a maximum of two field groups
What causes this issue? You have selected either no field groups at all or more than two field groups. However, you can only display or process one o...
GP115
Year &: Posting period & not possible
What causes this issue? Period &V2& is not allowed for planning for the planning period.System Response The system issues an error message a...
GP116
None of the planned periods is open for posting
What causes this issue? None of the posting periods you want planned is allowed for posting.System Response The system issues an error message and w...
Click on this link to search all SAP messages.