How To Fix GMAVC248 - You must re-initialize the complete control ledgers


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GMAVC - Message class for Grant Management AVC

  • Message number: 248

  • Message text: You must re-initialize the complete control ledgers

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GMAVC248 - You must re-initialize the complete control ledgers ?

    The SAP error message GMAVC248, which states "You must re-initialize the complete control ledgers," typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with the Actual/Plan/Variance (AVC) functionality. This error indicates that there is an inconsistency or a requirement to reset the control ledgers for the system to function correctly.

    Cause:

    1. Inconsistent Data: The control ledgers may have inconsistent or corrupted data, which can happen due to various reasons such as system upgrades, data migrations, or manual errors.
    2. Configuration Changes: Changes in the configuration of controlling areas, such as changes in the structure of cost centers or profit centers, can lead to the need for re-initialization.
    3. Missing Initialization: If the control ledgers were not properly initialized during the setup of the controlling area or after a significant change, this error may arise.

    Solution:

    To resolve the GMAVC248 error, you will need to re-initialize the control ledgers. Here are the steps to do this:

    1. Backup Data: Before making any changes, ensure that you have a backup of your data to prevent any loss.
    2. Access the Transaction: Use transaction code OKB9 (or the relevant transaction for your version) to access the initialization settings for the control ledgers.
    3. Re-initialize Control Ledgers:
      • Follow the prompts to re-initialize the control ledgers. This process may involve selecting the appropriate controlling area and confirming the re-initialization.
      • Ensure that you follow the specific steps as outlined in your organization's procedures or SAP documentation.
    4. Check Configuration: After re-initialization, verify that the configuration settings for the controlling area are correct and consistent with your business processes.
    5. Test the System: After re-initialization, perform tests to ensure that the controlling functionalities are working as expected and that the error message no longer appears.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may provide additional guidance or patches related to this error. You can search the SAP Support Portal for GMAVC248 or related keywords.
    • Documentation: Review the SAP documentation for the Controlling module to understand the implications of re-initializing control ledgers and any potential impacts on reporting and data integrity.
    • Consult with SAP Support: If the issue persists or if you are unsure about the steps, consider reaching out to SAP Support or your internal SAP team for assistance.

    By following these steps, you should be able to resolve the GMAVC248 error and ensure that your control ledgers are properly initialized and functioning.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant