Do you have any question about this error?
Message type: E = Error
Message class: GLPL - Message class planning FI-SL/GL
Message number: 721
Message text: Version locked for changes
The plan version that you are using is locked for changes.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
You can lock versions for changes using the FI-SL Customizing function
"Maintain Local/Global Version Parameters" - transaction GCP3/GCP4.
This lock must be removed if you want to change the plan values in
question.
Error message extract from SAP system. Copyright SAP SE.
GLPL721
- Version locked for changes ?The SAP error message GLPL721: Version locked for changes typically occurs in the context of the General Ledger (GL) or Profit Center Accounting (PCA) when a version of a planning layout or a planning version is locked for changes. This can happen for various reasons, such as:
Causes:
- Version Locking: The planning version you are trying to modify is locked because it is being used in a process that does not allow changes (e.g., a report is running, or a user is currently editing it).
- Authorization Issues: The user may not have the necessary authorizations to make changes to the version.
- Configuration Settings: The version may be configured to be locked for certain periods or under specific conditions.
- System Settings: The system may have been set up to prevent changes to certain versions during specific times (e.g., during a financial close).
Solutions:
- Check Version Status: Verify the status of the planning version in the system. You can do this by navigating to the relevant transaction (e.g., transaction code
KP06
for cost center planning) and checking if the version is indeed locked.- Unlock the Version: If you have the necessary authorizations, you can unlock the version. This is typically done in the configuration settings for planning versions.
- Wait for Processes to Complete: If the version is locked due to a running process, wait for that process to complete before attempting to make changes.
- Review Authorizations: Ensure that your user profile has the necessary authorizations to modify the planning version. You may need to contact your SAP security administrator for assistance.
- Consult Documentation: Review the SAP documentation or help files related to planning versions and locking mechanisms for more detailed guidance.
Related Information:
KP06
(Cost Center Planning), KPF6
(Profit Center Planning), or KP90
(Planning Version Management).If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth assistance.
Get instant SAP help. Start your 7-day free trial now.
GLPL720
Ledger is blocked for planning
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GLPL719
Version not allowed for manual planning
What causes this issue? The plan version you specified is not permitted for manual planning with the ledger you are using.System Response The system...
GLPL722
Plan period &1 &2 not allowed
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
GLPL723
Error while determining the periods for ledger &1 and fiscal year &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.