Message type: E = Error
Message class: GJ - Joint Venture Accounting
Message number: 826
Message text: Equity Type not Found for Project &
No equity type could be found for the entered project.
The project is invalid and cannot be cash called.
Verify that the project is assigned to a valid venture and equity
type.
Error message extract from SAP system. Copyright SAP SE.
GJ826
- Equity Type not Found for Project & ?The SAP error message GJ826, which states "Equity Type not Found for Project &," typically occurs in the context of project management and financial accounting within SAP, particularly in the Project System (PS) module. This error indicates that the system cannot find a valid equity type associated with the specified project.
Cause: Missing Configuration: The equity type for the project may not be defined in the system. This could happen if the project was created without the necessary equity type settings. Incorrect Project Settings: The project might not be properly configured to use the required equity type. Data Inconsistency: There may be inconsistencies in the master data or configuration settings related to the project or equity types. Authorization Issues: Sometimes, the user may not have the necessary authorizations to view or access the equity type.
Solution: Check Equity Type Configuration: Go to the configuration settings in SAP and verify that the equity type is defined for the project.
Get instant SAP help. Sign up for our Free Essentials Plan.
GJ825
No Venture Found for Project &
What causes this issue? No venture could be found for the entered project.System Response Cash call requires a valid project.How to fix this error? ...
GJ824
Recovery Indicator for Project & not Billable.
What causes this issue? The recovery indicator for the entered project is not billable. The system issues an error message and will not allow you to ...
GJ827
Cash Call Batch Number Can not Be Found.
What causes this issue? The batch number cannot be found for the detail items on table T8J4B. The open of the batch number has failed.How to fix this...
GJ828
Enter only one cost object per equity type. Project, Cost Center or Order
What causes this issue? More than one cost object (Project, Cost Center or Order) were maintained for one equity type. Only one cost object per equit...
Click on this link to search all SAP messages.