Do you have any question about this error?
Message type: E = Error
Message class: GJ - Joint Venture Accounting
Message number: 118
Message text: JV object type is required by JV parameters for company &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
GJ118
- JV object type is required by JV parameters for company & ?The SAP error message GJ118 indicates that a Joint Venture (JV) object type is required for the JV parameters in the specified company code. This error typically arises in the context of Joint Venture accounting, where specific configurations and parameters must be set up correctly for transactions to be processed.
Cause:
- Missing Configuration: The JV object type may not be configured for the specified company code in the system.
- Incorrect Parameters: The JV parameters for the company code may not have been set up correctly, leading to the requirement for a JV object type not being met.
- Data Entry Error: There may be an error in the data entry where the JV object type is not specified or is incorrectly specified.
Solution:
Check Configuration:
- Go to the configuration settings for Joint Venture accounting in SAP.
- Ensure that the JV object type is defined for the company code in question.
- You can check this in the following path:
- SPRO > Financial Accounting > Joint Venture Accounting > Basic Settings > Define JV Object Types.
Review JV Parameters:
- Verify the JV parameters for the company code to ensure that they are correctly set up.
- You can check this in the following path:
- SPRO > Financial Accounting > Joint Venture Accounting > Basic Settings > Define JV Parameters.
Data Entry Validation:
- Ensure that when entering data related to Joint Venture transactions, the correct JV object type is specified.
- Double-check the transaction or document that triggered the error for any missing or incorrect information.
Consult Documentation:
- Review SAP documentation or help files related to Joint Venture accounting for additional guidance on required configurations and parameters.
Contact Support:
- If the issue persists after checking the configurations and parameters, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
By following these steps, you should be able to resolve the GJ118 error and ensure that the necessary JV object types are correctly configured for your company code.
Get instant SAP help. Start your 7-day free trial now.
GJ117
Venture & and equity group & is not active
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GJ116
Venture & and equity group & do not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GJ119
Maintain venture, equity type and recov. indicator, acc. to object type &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GJ120
Assigned Quantity of & & Is Greater than Assignment Basis of & &
What causes this issue? The assigned quantity of &V1& &V2& is greater than the assignment quantity of &V3& &V4&. If ...
Click on this link to search all SAP messages.