Do you have any question about this error?
Message type: E = Error
Message class: GI - FI-SL update
Message number: 269
Message text: Error during number assignment of plan document in General Ledger (ERP)
When a planning document is updated into the General Ledger (ERP), a
unique document number is assigned. An error occurred during number
assignment.
The object is called <LS>GL_FLEXPL</>.
The number range is <LS>01</>.
The posting is terminated.
Use transaction SNRO to check number range object <LS>GL_FLEXPL</>, in
particular the status of the interval <LS>01</>.
<DS:TRAN.SNRO>Check Number Range Object</>
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
GI269
- Error during number assignment of plan document in General Ledger (ERP) ?The SAP error message GI269, which indicates "Error during number assignment of plan document," typically occurs in the context of General Ledger (GL) accounting when there is an issue with the assignment of document numbers for planning documents. This error can arise due to various reasons, including configuration issues, number range problems, or data inconsistencies.
Causes of GI269 Error
Number Range Issues: The number range for the planning documents may not be properly defined or may be exhausted. This can happen if the number range is not set up correctly in the system or if the defined range has been fully utilized.
Configuration Errors: Incorrect configuration in the controlling area or in the settings for planning documents can lead to this error. This includes settings related to document types and number ranges.
Authorization Issues: Sometimes, the user may not have the necessary authorizations to create or modify planning documents, leading to this error.
Data Inconsistencies: If there are inconsistencies in the data being processed, such as missing or incorrect entries in related tables, this can trigger the error.
Solutions to GI269 Error
Check Number Ranges:
- Go to the transaction code SNRO (Number Range Objects) and check the number range object related to planning documents (usually
FINS_PLAN
or similar).- Ensure that the number range is defined correctly and that there are available numbers in the range. If necessary, extend the number range.
Review Configuration:
- Check the configuration settings in the controlling area for planning documents. Ensure that all necessary settings are correctly defined.
- Use transaction code SPRO to navigate to the relevant configuration settings.
User Authorizations:
- Verify that the user has the necessary authorizations to create or modify planning documents. This can be checked in the user roles and profiles.
Check for Data Inconsistencies:
- Review the data being processed for any inconsistencies or missing entries. This may involve checking related tables or logs for errors.
Consult SAP Notes:
- Search for relevant SAP Notes in the SAP Support Portal that may address this specific error. There may be patches or updates that resolve known issues.
Debugging:
- If the issue persists, consider debugging the process to identify the exact point of failure. This may require technical expertise.
Related Information
Transaction Codes:
SAP Documentation: Review the official SAP documentation for General Ledger and planning documents for more detailed information on configuration and troubleshooting.
SAP Community: Engage with the SAP Community forums for insights from other users who may have encountered similar issues.
By following these steps, you should be able to diagnose and resolve the GI269 error in SAP. If the problem persists, consider reaching out to your SAP support team or consulting with an SAP expert.
Get instant SAP help. Start your 7-day free trial now.
GI268
No country chart of accts assigned to CCde &
What causes this issue? This ledger contains accounts from the country chart of accounts. As a result, the balance carry forward program performs a c...
GI267
Grp chrt of accnts is not assgnd to operative chrt of accnts (CCde &)
What causes this issue? This ledger contains accounts from the group chart of accounts. As a result, the balance carry forward program checks the acc...
GI270
A chart of accounts is not assigned to company code &, ledger &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GI271
Error while issuing numbers for documents in period 0
What causes this issue? A document number was issued when the line items were posted to the balance carryforward period (period 0). An error occurred...
Click on this link to search all SAP messages.