Do you have any question about this error?
Message type: E = Error
Message class: GHO_PLN_MANAGE_PLAN - Messages for Manage Production Plan applications
Message number: 044
Message text: Invalid UOM &1 for Network &2 with medium &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
GHO_PLN_MANAGE_PLAN044
- Invalid UOM &1 for Network &2 with medium &3 ?The SAP error message GHO_PLN_MANAGE_PLAN044 indicates that there is an issue with the Unit of Measure (UOM) associated with a network in the project planning or management module. This error typically arises when the system encounters an invalid or unrecognized UOM for a specific network and medium.
Cause:
- Invalid UOM: The UOM specified for the network is not defined in the system or is not valid for the medium being used.
- Configuration Issues: There may be configuration issues in the material master or the network settings that do not align with the expected UOM.
- Data Entry Errors: There could be a typographical error or incorrect data entry when specifying the UOM for the network.
- Missing Master Data: The necessary master data for the UOM or the medium may not be set up correctly in the system.
Solution:
Check UOM Configuration:
- Go to the material master data and verify that the UOM is correctly defined for the material associated with the network.
- Ensure that the UOM is valid for the medium specified in the error message.
Validate Network Settings:
- Review the network settings in the project management module to ensure that the UOM is correctly assigned and that it matches the expected values for the medium.
Correct Data Entry:
- Double-check the entries made for the UOM in the network. Look for any typographical errors or incorrect values.
Review Master Data:
- Ensure that all necessary master data related to the UOM and medium is correctly set up in the system. This includes checking the configuration of the UOM in the relevant tables.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidelines on UOM configuration and network management.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
MM03
(Display Material), CNO1
(Create Network), or CJ20N
(Project Builder) to check and modify the relevant data.By following these steps, you should be able to identify and resolve the issue causing the GHO_PLN_MANAGE_PLAN044 error message.
Get instant SAP help. Start your 7-day free trial now.
GHO_PLN_MANAGE_PLAN043
Only Quantity and UOM fields can be updated in Item record
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GHO_PLN_MANAGE_PLAN042
Only Active Flag field can be updated in Header record
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GHO_PLN_MANAGE_PLAN045
No active record(s) in database for the selected date range
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GHO_PLN_MANAGE_PLAN046
No valid link found for Network Object &1 with medium &3 and Network &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.