How To Fix GHO_DEFERMENT_BO029 - Time period for plan &1 and event &2 do not overlap


GHO_DEFERMENT_BO029 - Overview

  • Message type: E = Error

  • Message class: GHO_DEFERMENT_BO - Deferment BO message class

  • Message number: 029

  • Message text: Time period for plan &1 and event &2 do not overlap

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


GHO_DEFERMENT_BO029 - Details

  • The SAP error message GHO_DEFERMENT_BO029 indicates that there is a mismatch between the time period defined for a planning object (plan &1) and the event (event &2) you are trying to process. This typically occurs in scenarios involving planning and scheduling, where the time frames for different components do not align.
    
    Cause: Non-Overlapping Time Periods: The time period for the planning object does not overlap with the time period of the event. This could happen if: The planning object is set for a different fiscal year or period than the event. The event is scheduled outside the valid time frame of the planning object. Incorrect Configuration: There may be configuration issues in the planning settings or event definitions that lead to this mismatch. Data Entry Errors: Manual entry errors when defining the planning object or event can lead to incorrect time periods.
    Solution: Check Time Periods: Verify the time periods for both the planning object and the event.

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


GHO_DEFERMENT_BO029 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker