Do you have any question about this error?
Message type: E = Error
Message class: GHO_BO -
Message number: 073
Message text: End date of link &1 is not equal to the start date of link &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
GHO_BO073
- End date of link &1 is not equal to the start date of link &2 ?The SAP error message GHO_BO073 indicates a mismatch in the date links between two objects in a business object (BO) or a similar structure. Specifically, it suggests that the end date of one link does not match the start date of another link, which can lead to inconsistencies in data processing or reporting.
Cause:
- Date Mismatch: The most common cause of this error is that the end date of the first link (link &1) does not match the start date of the second link (link &2). This can happen due to incorrect data entry or configuration.
- Data Integrity Issues: If the data has been manually altered or if there are issues with data migration, it can lead to inconsistencies in the date fields.
- Configuration Errors: Incorrect configuration in the business object or the links between them can also lead to this error.
Solution:
- Check Date Fields: Review the date fields for both links involved in the error. Ensure that the end date of link &1 is equal to the start date of link &2.
- Correct Data Entry: If you find discrepancies, correct the date entries in the relevant records. This may involve updating the end date of the first link or the start date of the second link.
- Review Configuration: If the issue persists, check the configuration settings for the business object and the links. Ensure that they are set up correctly to maintain data integrity.
- Data Consistency Checks: Run data consistency checks or validation reports to identify any other potential issues in the data that may lead to similar errors.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the business object you are working with.
Related Information:
By following these steps, you should be able to identify and resolve the cause of the GHO_BO073 error message in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
GHO_BO072
Deletion not allowed; there was an allocation run on the link &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GHO_BO071
Assign medium to the link
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GHO_BO074
Maintain values in another unit of measure
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GHO_BO075
Simulation mode
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.