How To Fix GG019 - Correct the entry for the activity


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GG - Messages for FI-SL customizing

  • Message number: 019

  • Message text: Correct the entry for the activity

  • Show details Hide details
  • What causes this issue?

    You have tried to assign activity &V1& to ledger &V2&. You cannot
    perform this assignment. This could be due to the following:
    a) Activity &V1& does not exist.
    b) The ledger &V2& - activity &V1& assignment already exists.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Check your entry.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GG019 - Correct the entry for the activity ?

    The SAP error message GG019, which states "Correct the entry for the activity," typically occurs in the context of project management or controlling when there is an issue with the data entered for a specific activity in a project. This error can arise due to various reasons, including incorrect or incomplete data entries, inconsistencies in the project structure, or issues with the configuration of the project system.

    Causes of GG019 Error

    1. Incorrect Activity Assignment: The activity may not be correctly assigned to a work breakdown structure (WBS) element or project.
    2. Missing Data: Required fields for the activity may be missing or incorrectly filled out.
    3. Invalid Dates: The start or end dates for the activity may be outside the permissible range or not aligned with the project timeline.
    4. Status Issues: The status of the project or activity may not allow for the entry to be processed (e.g., if the project is closed).
    5. Configuration Issues: There may be issues with the configuration of the project system or controlling settings in SAP.

    Solutions to GG019 Error

    1. Check Activity Assignment: Ensure that the activity is correctly assigned to the appropriate WBS element or project. Verify that the WBS element is active and valid.
    2. Complete Required Fields: Review the activity details and ensure that all mandatory fields are filled out correctly. This includes descriptions, dates, and any other relevant information.
    3. Validate Dates: Check the start and end dates of the activity to ensure they are within the project timeline and are valid.
    4. Review Project Status: Ensure that the project and activity statuses allow for the entry you are trying to make. If the project is closed, you may need to reopen it or create a new project.
    5. Consult Configuration Settings: If you suspect a configuration issue, consult with your SAP administrator or a consultant to review the project system settings.

    Related Information

    • Transaction Codes: You may need to use transaction codes like CJ20N (Project Builder) or CJ02 (Change Project) to review and edit project activities.
    • SAP Notes: Check SAP Notes for any known issues or patches related to the GG019 error.
    • Documentation: Refer to SAP documentation for project management and controlling for detailed guidelines on activity management.
    • User Roles: Ensure that you have the necessary authorizations to make changes to project activities.

    If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a technical consultant for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author