Do you have any question about this error?
Message type: E = Error
Message class: GD - EDT: External data transfer
Message number: 118
Message text: You must enter a calculation date for costing
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
GD118
- You must enter a calculation date for costing ?The SAP error message GD118 ("You must enter a calculation date for costing") typically occurs when you are trying to perform a costing operation (such as creating or changing a cost estimate) without specifying a calculation date. The calculation date is essential for determining the validity of the cost estimate and ensuring that the correct data is used for the costing process.
Cause:
- Missing Calculation Date: The most common cause of this error is that the calculation date field is left blank when you are trying to execute a costing transaction.
- Incorrect Configuration: There may be issues with the configuration of the costing variant or the settings in the controlling area that require a calculation date.
- User Input Error: The user may have overlooked entering the calculation date due to oversight.
Solution:
Enter a Calculation Date:
- When prompted with the error, check the screen for a field labeled "Calculation Date" or similar. Enter a valid date that you want to use for the costing process.
- The calculation date should typically be the date on which you want the cost estimate to be valid.
Check Configuration:
- If you are consistently encountering this error, review the configuration settings for the costing variant in the controlling area. Ensure that the settings do not require additional parameters that are not being provided.
- You can access the configuration through the following path: SPRO > Controlling > Product Cost Controlling > Costing > Costing Variants.
Review User Input:
- Ensure that all required fields are filled out correctly before executing the costing transaction. Double-check for any other mandatory fields that may also be causing issues.
Consult Documentation:
- If you are unsure about the correct calculation date to use, consult your organization's documentation or reach out to your SAP support team for guidance.
Related Information:
By following these steps, you should be able to resolve the GD118 error and successfully enter a calculation date for your costing operations in SAP.
Get instant SAP help. Start your 7-day free trial now.
GD117
The parameters of the start setting are not correct.
What causes this issue? You tried to start an object transfer in a test run. You also activated the costing calculation. This combination is not perm...
GD116
A data split program could not be generated
What causes this issue? A data split program could not be created because of an internal error.System Response The system issues an error message an...
GD119
Switch on costing when applying cash flows
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GD120
The parameters of the start setting are not correct.
What causes this issue? When you start a transfer run for daily balances using 'test run for transfer' you must also start the costing calc...
Click on this link to search all SAP messages.