Do you have any question about this error?
Message type: E = Error
Message class: GA - Allocations
Message number: 832
Message text: The cycle was posted in current individual periods.
You execute cycle &V1&, start date &V2& in test mode. However, the
cycle is current in the system in periods &V3& so that this test run
will have differences compared to a production run.
For example, all senders in the cycle that are to allocate posted
values or quantities to 100 percent are actually credited completely
and are therefore not included in further processing (refer to further
messages in this log).
Analogously, the tracing factor values determined in test run can
differ from those in production run (for the receiver rule "variable
portions", "actual costs or planned costs" and a cost element posted by
the cycle).
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
GA832
- The cycle was posted in current individual periods. ?The SAP error message GA832 ("The cycle was posted in current individual periods") typically occurs in the context of the Controlling (CO) module, particularly when dealing with internal orders, cost centers, or activity types. This error indicates that there is an issue with the posting of costs or revenues in the current period, which is not allowed due to the configuration of the cycle or the posting rules.
Cause:
- Cycle Configuration: The cycle may be configured to post to a specific period or may not allow postings in the current period.
- Period Lock: The current period may be locked for posting due to financial closing activities.
- Incorrect Settings: The settings for the allocation cycle may not be correctly defined, leading to conflicts when trying to post.
- Posting Date: The posting date of the transaction may fall into a period that is not open for posting.
Solution:
Check Cycle Configuration:
- Review the allocation cycle settings in the SAP system. Ensure that the cycle is set up to allow postings in the current period.
- Navigate to the cycle definition in the CO module and verify the settings.
Open Posting Period:
- Ensure that the current period is open for posting. You can check this in the Financial Accounting (FI) module under the period closing settings.
- If the period is closed, you may need to open it temporarily to allow the posting.
Adjust Posting Date:
- Verify the posting date of the transaction. If it is set to a future date or a closed period, adjust it to a valid open period.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details on the allocation cycle and posting rules.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.
Related Information:
KSV5
(for displaying cycles) or KSV1
(for creating cycles) to manage allocation cycles.By following these steps, you should be able to identify the cause of the GA832 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
GA831
Cycle updated in all current execution periods
What causes this issue? You execute cycle &V1&, starting date &V2& in test run. However, the cycle is current in the system in all ex...
GA830
Breakpoint set: &.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GA833
Additional document rows generated due to delta update
What causes this issue? You are executing a cycle and have set the delta update to active. However, during the repeated execution of the cycle, the s...
GA834
No assignment of an assessment cost element to cost element &2
What causes this issue? In allocation structure &v1& there is no assignment of cost element &v2& to an assessment cost element.System...
Click on this link to search all SAP messages.