Message type: E = Error
Message class: GA - Allocations
Message number: 831
Message text: Cycle updated in all current execution periods
You execute cycle &V1&, starting date &V2& in test run. However, the
cycle is current in the system in all execution periods (period &V3& to
&V4&) so that this test run will have differences compared to a
production run.
For example, all senders in the cycle, which are to allocate posted
values or quantities to 100 percent are actually credited completely
and are therefore not included in further processing (refer to further
messages in this log).
Analogously, the tracing factor values determined in the test run can
differ from those in production run (for the receiver rule "variable
portions", "actual costs or planned costs" and a cost element posted by
the cycle).
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
GA831
- Cycle updated in all current execution periods ?The SAP error message GA831, which states "Cycle updated in all current execution periods," typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with internal orders, cost centers, or other controlling objects that utilize cycles for allocation.
Cause: This error usually arises when there is an attempt to execute a cycle that has already been updated in all current execution periods. This can happen due to: Cycle Execution: The cycle has already been executed for the current period, and the system does not allow re-execution without resetting or changing the execution status. Period Locking: The periods may be locked for posting or execution, preventing any further updates.
Configuration Issues: There may be issues with the configuration of the cycles or the settings in the controlling area.
Solution: To resolve the GA831 error, you can take the following steps: Check Execution Status: Verify if the cycle has already been executed for the current period.
Get instant SAP help. Sign up for our Free Essentials Plan.
GA830
Breakpoint set: &.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GA829
No. of decimal places rounded to is reduced for unit & from & to 3
What causes this issue? You are executing a cycle for indirect activity allocation and have defined for unit of measure &V1& &V2& dec...
GA832
The cycle was posted in current individual periods.
What causes this issue? You execute cycle &V1&, start date &V2& in test mode. However, the cycle is current in the system in periods ...
GA833
Additional document rows generated due to delta update
What causes this issue? You are executing a cycle and have set the delta update to active. However, during the repeated execution of the cycle, the s...
Click on this link to search all SAP messages.