Do you have any question about this error?
Message type: E = Error
Message class: GA - Allocations
Message number: 724
Message text: In segment &, the activity is incorrect for & &
The imported totals record for cost center &V2& and cost element &V3&
is incorrect because the quantity has not been fully posted. The
tracing factor for segment &V1& is therefore incorrect.
The totals record is not included in tracing factor determination.
Check the postings to cost center &V2& and cost element &V3&. You may
need to change the tracing factor in segment &v1&.
Error message extract from SAP system. Copyright SAP SE.
GA724
- In segment &, the activity is incorrect for & & ?The SAP error message GA724 typically indicates that there is an issue with the activity type assignment in the context of controlling (CO) or project systems (PS). This error occurs when the system detects that an activity type is not valid for the specified segment or context.
Cause:
- Incorrect Activity Type Assignment: The activity type assigned to a cost center or internal order may not be valid for the specified segment.
- Configuration Issues: There may be configuration issues in the controlling area or the activity type settings.
- Missing Authorizations: The user may not have the necessary authorizations to perform the activity in the specified segment.
- Data Inconsistencies: There could be inconsistencies in the master data related to the cost center, internal order, or activity type.
Solution:
- Check Activity Type Assignment: Verify that the activity type is correctly assigned to the cost center or internal order in the controlling area. Ensure that the activity type is valid for the segment you are working with.
- Review Configuration Settings: Go to the configuration settings in the SAP system (transaction code SPRO) and check the settings for activity types and cost centers. Ensure that they are correctly configured for the relevant controlling area.
- Validate Master Data: Check the master data for the cost center or internal order to ensure that all necessary fields are filled out correctly and that there are no inconsistencies.
- Authorization Check: Ensure that the user has the necessary authorizations to perform the activity. This can be checked with the help of the security team or by reviewing the user roles and profiles.
- Consult Documentation: Refer to SAP documentation or help resources for more detailed information on the specific error message and its context.
Related Information:
KS01
(Create Cost Center), KS02
(Change Cost Center), KSH1
(Activity Type), or KSH2
(Change Activity Type) to review and modify the relevant data.By following these steps, you should be able to identify and resolve the issue related to the GA724 error message in SAP.
Get instant SAP help. Start your 7-day free trial now.
GA723
In period & quantity is not complete for & &
What causes this issue? The quantity in period &V1& has not been completely posted for cost center &V2& and cost element &V3&...
GA722
Update of documents & to & is completed
What causes this issue? &V3& has been posted with document numbers &V1& thru &V2&.Error message extract from SAP system. Copy...
GA725
System error: incorrect layout of internal tables
What causes this issue? A serious program error occurred during the reading of an internal table.System Response Processing was terminated.How to fi...
GA726
Use a correct document type
What causes this issue? Document type &V1& has either not been defined or it cannot be used for the specific function. This could be because ...
Click on this link to search all SAP messages.