How To Fix GA724 - In segment &, the activity is incorrect for & &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GA - Allocations

  • Message number: 724

  • Message text: In segment &, the activity is incorrect for & &

  • Show details Hide details
  • What causes this issue?

    The imported totals record for cost center &V2& and cost element &V3&
    is incorrect because the quantity has not been fully posted. The
    tracing factor for segment &V1& is therefore incorrect.

    System Response

    The totals record is not included in tracing factor determination.

    How to fix this error?

    Check the postings to cost center &V2& and cost element &V3&. You may
    need to change the tracing factor in segment &v1&.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GA724 - In segment &, the activity is incorrect for & & ?

    The SAP error message GA724 typically indicates that there is an issue with the activity type assignment in the context of controlling (CO) or project systems (PS). This error occurs when the system detects that an activity type is not valid for the specified segment or context.

    Cause:

    1. Incorrect Activity Type Assignment: The activity type assigned to a cost center or internal order may not be valid for the specified segment.
    2. Configuration Issues: There may be configuration issues in the controlling area or the activity type settings.
    3. Missing Authorizations: The user may not have the necessary authorizations to perform the activity in the specified segment.
    4. Data Inconsistencies: There could be inconsistencies in the master data related to the cost center, internal order, or activity type.

    Solution:

    1. Check Activity Type Assignment: Verify that the activity type is correctly assigned to the cost center or internal order in the controlling area. Ensure that the activity type is valid for the segment you are working with.
    2. Review Configuration Settings: Go to the configuration settings in the SAP system (transaction code SPRO) and check the settings for activity types and cost centers. Ensure that they are correctly configured for the relevant controlling area.
    3. Validate Master Data: Check the master data for the cost center or internal order to ensure that all necessary fields are filled out correctly and that there are no inconsistencies.
    4. Authorization Check: Ensure that the user has the necessary authorizations to perform the activity. This can be checked with the help of the security team or by reviewing the user roles and profiles.
    5. Consult Documentation: Refer to SAP documentation or help resources for more detailed information on the specific error message and its context.

    Related Information:

    • Transaction Codes: You may need to use transaction codes such as KS01 (Create Cost Center), KS02 (Change Cost Center), KSH1 (Activity Type), or KSH2 (Change Activity Type) to review and modify the relevant data.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error message or provide additional troubleshooting steps.
    • Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    By following these steps, you should be able to identify and resolve the issue related to the GA724 error message in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author