Message type: E = Error
Message class: GA - Allocations
Message number: 125
Message text: Indirect activity allocation: Serious system error cost elem. master rec.
A serious system error occured in indirect activity allocation cycle
maintenance. The master data for cost element &V1& could not be read.
Cycle maintenance cannot be processed further.
Inform your system administrator.
Error message extract from SAP system. Copyright SAP SE.
GA125
- Indirect activity allocation: Serious system error cost elem. master rec. ?The SAP error message GA125, which states "Indirect activity allocation: Serious system error cost elem. master rec.," typically indicates a problem related to the cost element master record during an indirect activity allocation process. This error can arise due to various reasons, including configuration issues, missing or incorrect data in the cost element master record, or system inconsistencies.
Causes:
- Missing Cost Element Master Record: The cost element being used in the allocation may not exist or may not be properly configured in the system.
- Incorrect Configuration: The cost element may not be set up correctly for the type of allocation being performed (e.g., primary vs. secondary cost elements).
- Authorization Issues: The user may not have the necessary authorizations to access or modify the cost element master record.
- Data Inconsistencies: There may be inconsistencies in the data related to the cost element, such as missing or incorrect entries in related tables.
- System Bugs or Issues: There could be a bug in the SAP system or a temporary issue that is causing the error.
Solutions:
Check Cost Element Master Record:
- Verify that the cost element exists in the system and is correctly configured. You can do this by using transaction code KA03 (Display Cost Element).
- Ensure that the cost element is marked as active and is assigned to the correct controlling area.
Review Configuration:
- Check the configuration settings for the cost element in the controlling module. Ensure that it is set up for the intended use (e.g., indirect activity allocation).
- Use transaction code OKB9 to review the settings for activity types and their allocation.
Authorization Check:
- Ensure that the user executing the allocation has the necessary authorizations to access the cost element master record. This can be checked with the help of your SAP security team.
Data Consistency Check:
- Run consistency checks on the relevant data. You can use transaction codes like KAH1 or KAH2 to check for inconsistencies in cost elements.
System Logs and Notes:
- Check the system logs (transaction code SLG1) for any additional error messages or information that might provide more context about the issue.
- Look for SAP Notes related to this error message in the SAP Support Portal. There may be known issues or patches available.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP Support for further assistance. Provide them with detailed information about the error, including the steps leading up to it and any relevant logs.
Related Information:
By following these steps, you should be able to identify and resolve the underlying cause of the GA125 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
GA124
Activity types set up without dependent cost centers as receivers
What causes this issue? You have designated activity types as receivers in the current segment without, however, giving the corresponding cost center...
GA123
Receivers CCtr/act. type cannot be mixed with other types of receivers
What causes this issue? You used one or more receivers of the type cost center/activity type combined with other receiver types in the current segmen...
GA126
No valid activity types created
What causes this issue? Due to the selected sender and/or receiver rules in the segment, only activity types of category &V2& are allowed as ...
GA127
No master record created for receiver cost center/activ. type &/&
What causes this issue? In the indirect activity allocation framework, you designated the cost center/activity type V1&/&V2& as a receive...
Click on this link to search all SAP messages.