Do you have any question about this error?
Message type: E = Error
Message class: GA - Allocations
Message number: 066
Message text: The reference cycle has another allocation type
You can create cycles for the following allocation types:
Periodic transfers
Distribution
Assessment
The cycle names must be defined separately for each allocation type.
You have selected a cycle belonging to a different allocation type than
the transaction called up.
Processing is terminated.
Check the cycle name or choose the correct transaction.
Error message extract from SAP system. Copyright SAP SE.
GA066
- The reference cycle has another allocation type ?The SAP error message GA066, which states "The reference cycle has another allocation type," typically occurs in the context of asset accounting or when dealing with allocations in SAP. This error indicates that there is a circular reference in the allocation structure that involves different allocation types, which is not allowed.
Cause:
- Circular Reference: The error is primarily caused by a circular reference in the allocation structure. This means that an allocation is trying to reference itself indirectly through another allocation, which can lead to infinite loops.
- Different Allocation Types: The error specifically mentions "another allocation type," which suggests that the allocations involved are of different types (e.g., internal vs. external allocations).
- Configuration Issues: There may be configuration issues in the allocation structure or in the way the allocation cycles are defined.
Solution:
- Review Allocation Structure: Check the allocation structure to identify any circular references. Ensure that the allocations do not reference each other in a way that creates a loop.
- Check Allocation Types: Ensure that all allocations involved in the cycle are of the same type. If they are not, you may need to adjust the allocation types to ensure consistency.
- Adjust Configuration: If the allocation cycles are defined in the configuration, review the settings in the SAP system to ensure they are set up correctly. This may involve consulting with your SAP configuration team.
- Use Transaction Codes: Utilize transaction codes like
OKB9
(for defining allocation cycles) orKSV5
(for displaying allocation cycles) to analyze and modify the allocation cycles.- Testing: After making changes, perform tests to ensure that the error does not reoccur and that the allocations are processed correctly.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
GA065
The reference cycle has not been created
What causes this issue? Cycle &v1&, starting date &v2& does not exist.System Response This cycle cannot be referenced.How to fix thi...
GA064
System error: Tables T811M and T811J differ
What causes this issue? Both internal tables for assessment/distribution T811J and T811M do not match (table &V1&, field &V2&).System...
GA067
The reference cycle has another act/plan indicator
What causes this issue? You can define two types of cycles: Plan cycles Actual cycles The two different types of cycles are maintained with two diffe...
GA068
Do not enter over 100% for the sender
What causes this issue? The sender portion entered is greater than 100%. However, senders can only be credited with a value up to 100%.System Respons...
Click on this link to search all SAP messages.