Do you have any question about this error?
Message type: E = Error
Message class: GA - Allocations
Message number: 060
Message text: The reference cycle specified has other allocation type
You can create cycles for the following allocation types:
Periodic transfers
Distribution
Assessment
You must assign different names to the cyles depending on the
allocation type. You have selected a cycle belonging to a different
allocation type to the transaction called up.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check the name of the cycle or select the correct transaction.
Error message extract from SAP system. Copyright SAP SE.
GA060
- The reference cycle specified has other allocation type ?The SAP error message GA060, which states "The reference cycle specified has other allocation type," typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with internal orders, cost centers, or profit centers. This error indicates that there is a problem with the allocation cycle configuration, specifically that the cycle you are trying to execute has a different allocation type than what is expected.
Cause:
- Incorrect Allocation Type: The allocation cycle you are trying to use may have been defined with a different allocation type (e.g., assessment, distribution) than what is currently set in the system.
- Cycle Configuration Issues: The configuration of the allocation cycle may not be set up correctly, leading to mismatches in the expected allocation types.
- Reference Cycle Misconfiguration: If the cycle references another cycle, there may be a conflict in the allocation types defined in those cycles.
Solution:
Check Allocation Cycle Configuration:
- Go to the allocation cycle configuration in SAP (Transaction code: KSV1 for creating or KSV2 for changing).
- Verify that the allocation type defined in the cycle matches the type you are trying to execute.
Review Reference Cycles:
- If your cycle references another cycle, check the configuration of the referenced cycle to ensure that it is compatible with the allocation type you are using.
Adjust Allocation Types:
- If necessary, adjust the allocation types in the cycles to ensure they are consistent. This may involve changing the allocation type in the cycle definition or creating a new cycle with the correct settings.
Consult Documentation:
- Review SAP documentation or help resources for specific details on allocation types and cycles to ensure you are following best practices.
Testing:
- After making changes, test the allocation cycle again to ensure that the error is resolved.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP CO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
GA059
The reference cycle specified does not exist
What causes this issue? Cycle &v1&, starting date &v2&, which you entered as a reference, does not exist.System Response This cycle ...
GA058
Cycle & has not been created in & &
What causes this issue? Cycle &V1& in &V2& &V3& does not have a starting date.System Response This cycle cannot be processed...
GA061
The reference cycle specified has another actual/plan indicator
What causes this issue? You can define two types of cycles: Plan cycles Actual cycles You maintain the two different cycle types using two different ...
GA062
To-date is smaller than From-Date
What causes this issue? "To" date &v1& is smaller than "From" date &v2&. &SYSTEM_RESPONSE&. The system is...
Click on this link to search all SAP messages.