Do you have any question about this error?
Message type: E = Error
Message class: G6 - EDI messages in JV
Message number: 077
Message text: Monetary Amt var. 819 JID/JIL Ref# & SVCode && prop &
The total of JID's monetary amount does not equal the JIL's monetary
amount. The threshold amount applied was exceeded causing:
the document to be <ZH>parked</> instead of being posted.
,,<ZH>OR</>
the IDOC to be placed in <ZH>error status</> instead of being posted.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
A) A new transmission is necessary.
OR
B) When IDOC in error status: The Monetary amount threshold can be
increased and the IDOC reprocessed.
OR
C) When document parked: The document parked document can be posted.
Error message extract from SAP system. Copyright SAP SE.
G6077
- Monetary Amt var. 819 JID/JIL Ref# & SVCode && prop & ?The SAP error message G6077 typically indicates an issue related to monetary amounts in a financial transaction, particularly when dealing with specific reference numbers and codes. This error can arise in various contexts, such as during the posting of financial documents, invoice processing, or when executing certain financial reports.
Cause:
- Incorrect Configuration: The monetary amount variable (in this case, 819) may not be properly configured in the system.
- Data Entry Errors: There may be incorrect or missing data in the fields related to the transaction, such as the JID (Journal ID), JIL (Journal Item Line), or SVCode (Service Code).
- Currency Issues: There could be a mismatch in currency settings or conversion rates that are causing the monetary amount to be invalid.
- Validation Rules: The system may have specific validation rules that are not being met, leading to this error.
Solution:
- Check Configuration: Review the configuration settings for monetary amounts in the relevant financial module. Ensure that the variable 819 is correctly set up.
- Validate Data Entry: Double-check the entries for JID, JIL, and SVCode to ensure they are correct and complete. Look for any missing or incorrect values.
- Currency Settings: Verify that the currency settings are correct and that any necessary currency conversion rates are up to date.
- Review Validation Rules: Check if there are any specific validation rules that need to be satisfied for the transaction to be processed successfully.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on error G6077 and the monetary amount variable in question.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth assistance.
Get instant SAP help. Start your 7-day free trial now.
G6076
Monetary variance: IT1 & <> TDS &, Thres &
What causes this issue? 810 IT1s total: <ZH>$&V1&</> <> 810 TDS amount: <ZH>$&V2&</> Threshold: <ZH&...
G6075
BDC session & was created.
What causes this issue? An error occurred during the posting of the FB01 transaction. All the EDI mappings were maintained, but an error still occurr...
G6078
Monetary amount variance: JIL & <> AMT &, Threshold &
What causes this issue? 819 JILs total $&V1& <> 819 AMT amount $&V2&. Threshold $&V3&. The total of JIL's monetary...
G6079
Amt var: IT1 & <> PSA & Thres & Prop &
What causes this issue? Monetary amt var: 810 IT1s total $&V1& <> 819 PSA amt $&V2&, Threshold $&V3&. Property &V4&...
Click on this link to search all SAP messages.