Message type: E = Error
Message class: G5 - IS-Oil /Joint Venture/ Material transfer pricing
Message number: 760
Message text: The intercompany partner & from the old EG is not in the new EG
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
G5760
- The intercompany partner & from the old EG is not in the new EG ?The SAP error message G5760 indicates that there is an issue with intercompany partner assignments when transitioning from an old Enterprise Group (EG) to a new one. This error typically arises during processes such as intercompany billing, where the system expects certain partner assignments to be valid and present in the new configuration.
Cause: Missing Partner Assignment: The intercompany partner that was valid in the old Enterprise Group is not defined or assigned in the new Enterprise Group. Configuration Changes: Changes in the configuration of the Enterprise Groups may have led to the removal or alteration of partner assignments. Data Migration Issues: If data was migrated from the old EG to the new EG, there may have been issues during the migration process that resulted in missing or incorrect partner assignments.
Solution: Check Partner Assignments: Verify the intercompany partner assignments in the new Enterprise Group. Ensure that all necessary partners from the old EG are also
Get instant SAP help. Sign up for our Free Essentials Plan.
G5759
Cutback correction is only possible for a process with one old EG
What causes this issue? The process &1 with venture &2 in company code &3 has more than one old equity group. Because this step will cal...
G5758
A prerequisite step was not yet processed
What causes this issue? In company code & process & the step & has a pre-requisite step which needs to be performed first. This step is ...
G5761
The original EG or the new EG does not have an intercompany partner
What causes this issue? The original (old) equity group or the new equity group of the defined farm in/out or re-determination process does not have...
G5762
The inter-company partner & from the new EG does not exist in the old EG
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.