Do you have any question about this error?
Message type: E = Error
Message class: FTR_LC - Message class for Letter of Credit
Message number: 028
Message text: Pymnt date is inconsistent with L/C contract; enter a date from &1 to &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
FTR_LC028
- Pymnt date is inconsistent with L/C contract; enter a date from &1 to &2 ?The SAP error message FTR_LC028 indicates that there is an inconsistency between the payment date you are trying to enter and the date range defined in the Letter of Credit (L/C) contract. Specifically, the error message states that the payment date must fall within a specified range, which is indicated by the placeholders &1 (start date) and &2 (end date).
Cause:
- Date Range Violation: The payment date you are trying to enter does not fall within the valid date range specified in the L/C contract.
- Incorrect Data Entry: The date may have been entered incorrectly, either by mistake or due to a misunderstanding of the required format.
- Contract Configuration: The L/C contract may have been configured with specific date constraints that are not being adhered to.
Solution:
- Check the Date Range: Review the L/C contract to determine the valid date range for payments. Ensure that the payment date you are trying to enter falls within this range.
- Correct the Payment Date: If the payment date is outside the allowed range, adjust it to a date that is within the specified limits.
- Review Contract Settings: If you believe the date range is incorrect or needs to be adjusted, consult with the relevant stakeholders (e.g., contract manager, finance team) to review and possibly update the L/C contract settings.
- Consult Documentation: Refer to SAP documentation or user manuals for further guidance on handling L/C contracts and payment dates.
Related Information:
If the issue persists after following these steps, it may be beneficial to reach out to your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
FTR_LC027
Only flow type with category 85 is allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FTR_LC026
Not all documents are accepted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FTR_LC029
Not all documents are accepted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FTR_LC030
Doc. type &1 with same value of Creatn-Rel. and Pres-Rel. already exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.