How To Fix FMAVC129 - AVC index is correct; no correction needed


FMAVC129 - Overview

  • Message type: E = Error

  • Message class: FMAVC - Message class AVC funds management

  • Message number: 129

  • Message text: AVC index is correct; no correction needed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


FMAVC129 - Details

  • The SAP error message FMAVC129 indicates that the AVC (Availability Control) index is correct and that no correction is needed. This message typically arises in the context of budget management and availability control in SAP, particularly when working with funds management (FM) and controlling (CO) modules.
    
    Cause: The error message FMAVC129 usually occurs when: A budget check is performed, and the system determines that the current budget is sufficient and correctly allocated. There may have been an attempt to post a transaction that would normally require a budget correction, but the system finds that the AVC index is already in a valid state. The transaction being processed does not require any adjustments to the budget because the existing budget is adequate.
    Solution: Since the message indicates that no correction is needed, the following steps can be taken: Review the Transaction: Ensure that the transaction you are trying to post is valid and that it aligns with the existing

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


FMAVC129 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant