How To Fix FITVPS501 - Rheinland-Palatinate: Maximum drawing period 5 years


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FITVPS -

  • Message number: 501

  • Message text: Rheinland-Palatinate: Maximum drawing period 5 years

  • Show details Hide details
  • What causes this issue?

    The drawing period you entered is greater than that allowed by law.
    In Rheinland-Palatinate the maximum period is 5 years.

    System Response

    Rheinland-Palatinate: maximum drawing period 5 years

    How to fix this error?

    Reduce the interval.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FITVPS501 - Rheinland-Palatinate: Maximum drawing period 5 years ?

    The SAP error message FITVPS501 typically relates to the maximum drawing period for a specific financial transaction or process within the SAP system. In this case, it indicates that the maximum drawing period is set to 5 years for the Rheinland-Palatinate region, and the transaction you are attempting to execute exceeds this limit.

    Cause:

    1. Configuration Settings: The error is often due to configuration settings in the SAP system that define the maximum allowable drawing period for certain financial transactions or contracts.
    2. Data Entry: The user may have entered a date or period that exceeds the defined maximum drawing period.
    3. Regulatory Compliance: The limit may be in place to comply with local regulations or financial guidelines specific to the Rheinland-Palatinate region.

    Solution:

    1. Check Configuration: Review the configuration settings in the SAP system related to the drawing periods. This may involve checking the settings in the relevant customizing transaction (e.g., SPRO) to see if the maximum drawing period can be adjusted.
    2. Adjust Dates: If the transaction date or period entered exceeds the 5-year limit, adjust the dates to fall within the allowable range.
    3. Consult Documentation: Refer to any relevant documentation or guidelines that specify the drawing period limits for the Rheinland-Palatinate region.
    4. Contact Support: If you are unable to resolve the issue through configuration or data entry adjustments, consider reaching out to your SAP support team or consulting with an SAP expert who can provide further assistance.

    Related Information:

    • SAP Notes: Check for any SAP Notes related to this error message, as they may provide additional insights or updates regarding the issue.
    • User Manuals: Review user manuals or training materials that cover the specific financial processes you are working with, as they may contain information on drawing periods and related configurations.
    • Regulatory Guidelines: Familiarize yourself with any local regulations that may impact the drawing period settings in your SAP system.

    By following these steps, you should be able to identify the cause of the error and implement a suitable solution.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant