Message type: E = Error
Message class: FINS_SIS_OPITEMS - Document Splitting Information for Open Items
Message number: 009
Message text: Please reset the preparation completion status for Project &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message FINS_SIS_OPITEMS009 typically indicates that there is an issue with the preparation completion status of a project in the SAP system. This error often arises in the context of the SAP Project System (PS) or the SAP Financials module when there are inconsistencies or issues with the status of project items.
Cause: The error message suggests that the preparation completion status for a specific project (denoted by &1) needs to be reset. This can occur due to several reasons, including: Incomplete Data: The project may have incomplete or inconsistent data that prevents the system from processing it correctly. Status Issues: The project might be in a status that does not allow further processing, such as being locked or marked as completed without all necessary steps being finalized.
Configuration Issues: There may be configuration settings in the system that are not aligned with the current project status or requirements. User Actions: Manual changes or
Get instant SAP help. Sign up for our Free Essentials Plan.
FINS_SIS_OPITEMS008 Field &1 requires an entry for document splitting
What causes this issue? No data has been entered in Field &V1& of the BAdI FINS_SIS_OPITEMS. However, this field must contain a value because...
FINS_SIS_OPITEMS007 Field &1 in BAdI FINS_SIS_OPITEMS was filled incorrectly
What causes this issue? In BAdI FINS_SIS_OPTIEMS, you have changed the content of the field &V1& that was already filled before the BAdI was ...
FINS_SIS_OPITEMS010 &1 FAGL_SPLINFO records for company code &2 posted before act. date &3
What causes this issue? There are &V1& records in the document splitting information table <AB>FAGL_SPLINFO</> that are related t...
FINS_SIS_RECON000 Processing Ledger &1, Company Code &2, and Fiscal Year &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.