Do you have any question about this error?
Message type: E = Error
Message class: FINS_REV_REC - Event Based revenue recognition
Message number: 046
Message text: WIP Detail updated &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
FINS_REV_REC046
- WIP Detail updated &1 ?The SAP error message FINS_REV_REC046 typically relates to issues with Work in Progress (WIP) accounting in the context of revenue recognition. This error indicates that there is a problem with the WIP detail update for a specific project or order.
Cause:
The error can occur due to several reasons, including:
- Data Inconsistencies: There may be inconsistencies in the data related to the project or order, such as missing or incorrect entries in the WIP calculation.
- Configuration Issues: The configuration settings for WIP accounting or revenue recognition may not be set up correctly.
- Locked Records: The records that need to be updated might be locked by another process or user, preventing the update from occurring.
- Missing Authorizations: The user attempting to perform the update may not have the necessary authorizations to make changes to the WIP details.
- Technical Issues: There could be underlying technical issues, such as problems with the database or application server.
Solution:
To resolve the error, you can take the following steps:
Check Data Consistency:
- Review the WIP details for the specific project or order to ensure that all necessary data is present and correct.
- Use transaction codes like CJI3 (Project Actual Cost Line Items) or CJI5 (Project Actual Cost by WBS Element) to analyze the data.
Review Configuration:
- Ensure that the configuration for WIP and revenue recognition is correctly set up in the system. This may involve checking the settings in the controlling (CO) module.
Unlock Records:
- If records are locked, identify the user or process that has locked them and resolve the issue. You can use transaction SM12 to view and manage locked entries.
Check Authorizations:
- Verify that the user has the necessary authorizations to perform the update. This may involve checking roles and permissions in the user profile.
Technical Support:
- If the issue persists, consider reaching out to your SAP Basis team or technical support for assistance. They can help diagnose any underlying technical issues.
Consult SAP Notes:
- Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message. There may be patches or updates available that can resolve the issue.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
FINS_REV_REC045
Data import is not possible
What causes this issue? Data import of the parameters is not possible. Perhaps the data was deleted or the data structures of the parameters to be im...
FINS_REV_REC044
Plan data used adapted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FINS_REV_REC047
Cost element assignment to resource ID &4 missing for &2, WBS element &3
What causes this issue? The customer project provides plan values for revenue recognition. If it does not supply cost elements for all plan values re...
FINS_REV_REC048
Inconsistent currencies for currency type &1 and currency &2, column &3
What causes this issue? Some currencies are mandatory for a revenue recognition document to be posted. The quoted currency is missing.System Response...
Click on this link to search all SAP messages.