Message type: E = Error
Message class: FINS_IC_CUST - Manage Currencies: Customizing
Message number: 013
Message text: Changes were found related to ledger &1, company code &2
The ledger settings were changed after the preparation phase of the
current project was completed.
Differences were found related to the assignment of ledger &V1& to
company code &V2&. This assignment is either new or has been deleted
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
In non-production systems, you can reset the data in the project cockpit
first and then reset <LS>Complete Preparations</>. In this way, the
snapshot of the project configuration settings is updated the next time
you perform the <LS>Complete Preparations</> step.
Alternatively, you can change the message type (and even suppress the
message) in
<DS:TRAN.OBA5>Change Message Control</> using the application area
FINS_IC_CUST and message = 013.
If the message type is I (Info), S (Success) or W (Warning), the project
can then be completed.
Note: This function is only supported in non-production systems.
Intermediate changes to the project configuration will always cause an
error message in production systems and the project cannot be completed.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message FINS_IC_CUST013 typically indicates that there are inconsistencies or changes detected in the configuration related to the specified ledger and company code. This error often arises in the context of intercompany accounting, where the system expects certain configurations to be consistent across different company codes or ledgers.
Cause: Configuration Changes: Changes made to the configuration settings for the specified ledger or company code that are not aligned with the existing settings. Inconsistent Settings: Differences in settings between the company codes or ledgers that are supposed to be consistent, such as currency settings, fiscal year variants, or other accounting parameters. Data Migration Issues: If data has been migrated or imported, inconsistencies may arise if the new data does not match the expected configuration. Customizations: Custom developments or enhancements that may have altered the standard behavior of the system.
Solution: Review Configuration: Check the configuration settings for the specified ledger and company code. Ensure that they
Get instant SAP help. Sign up for our Free Essentials Plan.
FINS_IC_CUST012
Changes were found in ledger &1, setting: "&2"
What causes this issue? The current configuration settings of all ledgers, which are assigned to the project<(>,<)> have been compared wi...
FINS_IC_CUST011
Entry missing for ledger &1, company code &2
What causes this issue? The configuration settings of the current project were changed after the preparation phase of the project was completed. Diff...
FINS_IC_CUST014
Account missing in adjustment category "&1" for CoCode &2 / ChtAccts &3
What causes this issue? For company code &V2&, the adjustment category "&V1&" in chart of accounts &V3& is missing ...
FINS_IC_CUST015
Acct &1 in Adjmt Cat "&2" incorrectly (or not) defined for CC &3 / CoA &4
What causes this issue? Account &V1& is used for adjustment category "&V2&" and chart of accounts &V4&. However, ac...
Click on this link to search all SAP messages.