How To Fix FI596 - BS element &1/&2/&3 and corresp. budget object: attribute &4 is different


FI596 - Overview

  • Message type: E = Error

  • Message class: FI - TR-FM Funds Management

  • Message number: 596

  • Message text: BS element &1/&2/&3 and corresp. budget object: attribute &4 is different

  • Show details Hide details
  • What causes this issue?

    With the <DS:GLOS.3526B987AFAB52B9E10000009B38F974>BS element</> &v1&/
    &v2&/&v3& and the corresponding
    <DS:GLOS.354F043503B61296E10000009B38F983>Budget element</> the
    characteristics of the commitment item are different. The reason for
    this is that you have deleted an account assignment item and have
    created a summarization item with the same name.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    If you want to transfer the change to the commitment item in Position
    Management, execute a component matching.
    Choose <LS>Extras -> Match components</>.
    If the change is not to be transferred to Position Management, then
    reverse the master data change of the commitment item in Funds
    Management so as to regain the consistency of both components.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


FI596 - Details

  • The SAP error message FI596 indicates a discrepancy in the budget data related to a budget structure element. Specifically, it points out that the attribute of a budget object is different from what is expected. This error typically arises in the context of budget control in the SAP system, particularly when working with the Funds Management (FM) module.
    
    Cause: The error message FI596 can occur due to several reasons: Inconsistent Budget Data: The budget object being referenced has attributes that do not match the expected values in the budget structure.
    Configuration Issues: There may be a misconfiguration in the budget structure or the budget object attributes in the system. Data Entry Errors: Incorrect data entry when creating or modifying budget objects can lead to this error. Changes in Budget Structure: If the budget structure has been changed (e.g., attributes have been modified), existing budget objects may not align with the new structure.
    Solution: To resolve the FI596 error,

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


FI596 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author