Do you have any question about this error?
Message type: E = Error
Message class: FCO_COST_CENTER - Manage Cost Center
Message number: 009
Message text: Please fill in the Controlling Area field.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
FCO_COST_CENTER009
- Please fill in the Controlling Area field. ?The SAP error message FCO_COST_CENTER009 indicates that the "Controlling Area" field is not filled in when trying to create or modify a cost center. This error typically occurs in the context of the Controlling (CO) module in SAP, where cost centers are used for tracking costs within an organization.
Cause:
The error is caused by the absence of a value in the "Controlling Area" field. The Controlling Area is a crucial organizational unit in SAP that defines the structure for cost accounting. It is necessary for the system to know which controlling area the cost center belongs to in order to process the data correctly.
Solution:
To resolve this error, you need to ensure that the "Controlling Area" field is filled in before proceeding with the transaction. Here are the steps to do this:
Navigate to the Cost Center Creation/Modification Screen:
- Go to the transaction code for creating or modifying cost centers (e.g., KS01 for creating a cost center or KS02 for changing a cost center).
Fill in the Controlling Area:
- In the relevant field, enter the appropriate Controlling Area. This should be a valid controlling area that has been defined in your SAP system.
Complete the Required Fields:
- Ensure that all mandatory fields are filled out correctly. This may include the cost center name, description, and other relevant details.
Save the Changes:
- After filling in the required fields, save your changes. The error should no longer appear if the Controlling Area is correctly specified.
Related Information:
If you continue to experience issues after following these steps, it may be helpful to consult with your SAP administrator or support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
FCO_COST_CENTER008
Could not save the draft.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FCO_COST_CENTER007
Could not determine the validity period with end date &1.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FCO_COST_CENTER010
The new validity period cannot overlap with more than one period.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FCO_COST_CENTER011
Cost center &1 already exists in controlling area &2.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.