How To Fix FCO_AVC_PS043 - Budget currency &1 in profile &2 isn't supported by project &3.


FCO_AVC_PS043 - Overview

  • Message type: E = Error

  • Message class: FCO_AVC_PS - Availability Control: Project System

  • Message number: 043

  • Message text: Budget currency &1 in profile &2 isn't supported by project &3.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


FCO_AVC_PS043 - Details

  • The SAP error message FCO_AVC_PS043 indicates that there is an issue with the budget currency configuration for a specific project. This error typically arises in the context of Project System (PS) and Budget Control (BC) functionalities within SAP.
    
    Cause: The error message is triggered when: The budget currency defined in the budget profile does not match the currency used in the project. The project is set up to use a currency that is not supported by the budget profile assigned to it. There may be inconsistencies in the configuration of the project or budget profile settings.
    Solution: To resolve the error, you can take the following steps: Check Project Currency: Go to the project definition in SAP and verify the currency assigned to the project. This can be done in the project management transaction (e.g., CJ02). Check Budget Profile: Review the budget profile assigned to the project. You can do this by navigating to the configuration settings for budget profiles (transaction

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


FCO_AVC_PS043 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author