How To Fix FCO_AVC_CC106 - Specify valid crcy type in budget availiabilty ctrl prfl configuration.


FCO_AVC_CC106 - Overview

  • Message type: E = Error

  • Message class: FCO_AVC_CC - Availability Control: Cost Centers

  • Message number: 106

  • Message text: Specify valid crcy type in budget availiabilty ctrl prfl configuration.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


FCO_AVC_CC106 - Details

  • The SAP error message FCO_AVC_CC106 indicates that there is an issue with the currency type configuration in the budget availability control profile. This error typically arises when the system is unable to find a valid currency type for the budget availability control settings.
    
    Cause: Missing Currency Type Configuration: The budget availability control profile may not have a valid currency type assigned. Incorrect Configuration: The currency type specified in the configuration might not be recognized or is incorrectly set up. Profile Assignment Issues: The budget availability control profile may not be properly assigned to the relevant controlling area or organizational unit.
    Solution: To resolve the error, you can follow these steps: Check Budget Availability Control Profile: Go to the configuration settings for the budget availability control profile in SAP. Navigate to the relevant transaction (usually through SPRO) and check the settings under Controlling -> Budgeting -> Budget Availability Control. Ensure that a valid currency type is specified in the profile. Assign Currency

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


FCO_AVC_CC106 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author