Do you have any question about this error?
Message type: E = Error
Message class: FARR_INB_MAIN - Messages for Inbound Processing
Message number: 079
Message text: Item &1: POB could not be determined (acct. principle &2)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
FARR_INB_MAIN079
- Item &1: POB could not be determined (acct. principle &2) ?The SAP error message FARR_INB_MAIN079 indicates that the system could not determine the Profitability Object (POB) for a specific item in the context of the accounting principle being used. This error typically arises in the context of Financial Accounting and Controlling (FI/CO) modules, particularly when dealing with asset accounting or internal orders.
Cause:
- Missing Configuration: The Profitability Object (POB) may not be configured correctly in the system. This could be due to missing settings in the controlling area or the relevant master data.
- Incorrect Account Assignment: The account assignment for the item may not be set up correctly, leading to the inability to determine the POB.
- Inconsistent Data: There may be inconsistencies in the data related to the accounting principles or the master data associated with the item.
- Missing Master Data: The required master data for the Profitability Object may not exist or may not be properly linked to the item in question.
Solution:
- Check Configuration: Review the configuration settings for the Profitability Object in the controlling area. Ensure that all necessary settings are in place for the accounting principles being used.
- Review Account Assignment: Verify the account assignment for the item. Ensure that it is correctly assigned to a Profitability Object and that the relevant master data is complete.
- Validate Master Data: Check the master data for the item and ensure that it is correctly set up. This includes verifying that the Profitability Object is linked to the relevant cost centers, internal orders, or other relevant entities.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the configuration of Profitability Objects and related settings.
- Debugging: If the issue persists, consider using debugging tools in SAP to trace the logic that leads to the error message. This can help identify the exact point of failure in the determination process.
Related Information:
OKB9
(for account assignment) or KOB1
(for displaying cost line items) to investigate further.If the problem continues after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP FI/CO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
FARR_INB_MAIN076
Item &1: Cost Condition &2 doesn't exist on the Cost Order RAI.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FARR_INB_MAIN075
Amount in local currency &2 cannot be negative for item ID &1.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FARR_INB_MAIN080
Item &1: Processing of predecessor chain leads to a negative quantity
What causes this issue? Item &v1& is part of a predecessor document chain. It refers either to a predecessor document or it represents a pred...
FARR_INB_MAIN081
Unsupported combination of the indicators on condition level
What causes this issue? The <ZK>Statistical</> and the <ZK>Ignore Cost-based CO-PA</> indicators cannot be set at the same ti...
Click on this link to search all SAP messages.