How To Fix FARR_CONTRACT_MAIN189 - Perf. Oblig. &1 should be time based since event type is CC


FARR_CONTRACT_MAIN189 - Overview

  • Message type: E = Error

  • Message class: FARR_CONTRACT_MAIN - Revenue Accounting: Contract Management

  • Message number: 189

  • Message text: Perf. Oblig. &1 should be time based since event type is CC

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FARR_CONTRACT_MAIN189 - Perf. Oblig. &1 should be time based since event type is CC ?
    The SAP error message FARR_CONTRACT_MAIN189 typically occurs in the context of contract management, particularly when dealing with performance obligations in the SAP system. This error indicates that the performance obligation (Perf. Obligation) should be time-based because the event type is set to "CC" (which usually stands for "Contract Change" or similar).
    
    Cause: Event Type Configuration: The event type "CC" is configured to require time-based performance obligations. If the performance obligation is not set up correctly to reflect this requirement, the error will occur. Data Entry Issues: There may be inconsistencies or missing data in the contract or performance obligation that do not align with the expected time-based structure. Customizations: If there are custom developments or modifications in the SAP system, they might not be handling the event types and performance obligations correctly.
    Solution: Check Event Type Configuration: Review the configuration of the event type "CC" in the SAP system. Ensure that it is set to require

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author