Do you have any question about this error?
Message type: E = Error
Message class: FARR_CONTRACT_MAIN - Revenue Accounting: Contract Management
Message number: 042
Message text: Error while locking contract &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
FARR_CONTRACT_MAIN042
- Error while locking contract &1 ?The SAP error message FARR_CONTRACT_MAIN042 indicates that there was an error while trying to lock a contract in the system. This error typically occurs in the context of contract management within the SAP system, particularly in the area of Asset Accounting (FI-AA) or related modules.
Cause:
The error can be caused by several factors, including:
- Concurrent Access: Another user or process may already be accessing or locking the contract, preventing your transaction from obtaining the necessary lock.
- Database Lock Issues: There may be issues with database locks that are not being released properly, leading to conflicts.
- Authorization Issues: The user may not have the necessary authorizations to lock the contract.
- System Performance: High system load or performance issues may lead to timeouts or failures in acquiring locks.
Solution:
To resolve the error, you can try the following steps:
Check for Concurrent Users: Verify if another user is currently working on the same contract. If so, wait for them to finish or coordinate with them to avoid conflicts.
Release Locks: Use transaction code SM12 to check for and release any unnecessary locks on the contract. You can search for locks by user or object type.
Check Authorizations: Ensure that the user has the necessary authorizations to lock the contract. You may need to consult with your SAP security team to verify and adjust authorizations if needed.
System Performance: Monitor system performance and check for any issues that may be causing delays or timeouts. If the system is under heavy load, consider scheduling the operation during off-peak hours.
Retry the Operation: After addressing the above points, try to perform the operation again to see if the issue persists.
Consult SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
Contact SAP Support: If the issue continues after trying the above solutions, consider reaching out to SAP Support for further assistance.
Related Information:
By following these steps, you should be able to diagnose and resolve the FARR_CONTRACT_MAIN042 error effectively.
Get instant SAP help. Start your 7-day free trial now.
FARR_CONTRACT_MAIN041
Contract &1 is locked by user &2 (&3)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FARR_CONTRACT_MAIN040
Start date of right of return not specified for performance obligation &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FARR_CONTRACT_MAIN043
Field &1 must not be specified for non-time-based perf. oblig. &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FARR_CONTRACT_MAIN044
Creation of linked POB is not possible; POB &1 is not a leading POB
What causes this issue? You have attempted to link a performance obligation to a performance obligation that is not <ZK>leading</>.System...
Click on this link to search all SAP messages.