Message type: E = Error
Message class: FARR_CONTR_LIFECYCLE - Message from Contract Lifecyle (RAR 2.0 Object Model)
Message number: 027
Message text: Account redetermination for contract &1 failed: see error log.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
FARR_CONTR_LIFECYCLE027
- Account redetermination for contract &1 failed: see error log. ?The SAP error message FARR_CONTR_LIFECYCLE027 indicates that there was a failure in the account redetermination process for a specific contract. This error typically occurs in the context of contract management within the SAP system, particularly in the area of financial accounting and asset accounting.
Cause: The error can be caused by several factors, including but not limited to:
Configuration Issues: Incorrect configuration settings in the contract management or financial accounting modules. Missing Data: Required data for the contract or related master data may be missing or incomplete. Authorization Issues: The user may not have the necessary authorizations to perform the account redetermination. System Errors: Technical issues or bugs in the SAP system that prevent the process from completing successfully. Inconsistent Data: Data inconsistencies in the contract or related financial documents that prevent the system from determining the correct accounts.
Solution: To resolve the error, you can follow these steps: Check the Error Log: Review the error log for more detailed
Get instant SAP help. Sign up for our Free Essentials Plan.
FARR_CONTR_LIFECYCLE026
Cannot change def. method of POB &1 if contract was terminated early.
What causes this issue? The deferral method of a time-based performance obligation (POB) cannot be changed if the contract, which the POB belongs to,...
FARR_CONTR_LIFECYCLE025
Cannot change start date of POB &1 if contract was terminated early.
What causes this issue? The start date of a time-based performance obligation (POB) cannot be changed if the contract, which the POB belongs to, was ...
FARR_CONTR_LIFECYCLE029
SSP currency &2 of POB &1 differs from contract price currency &3.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FARR_CONTR_LIFECYCLE030
Cannot change main price cond. type of perf. oblig. &1 to statistic.
What causes this issue? A performance obligation must always have exactly one main price condition type. This condition type can not be marked with t...