Do you have any question about this error?
Message type: E = Error
Message class: FAGL_SWITCH_LEAD_LDG - Technical Changeover of Leading View in General Ledger (New)
Message number: 120
Message text: Period end &1 in variant &2 differs from &3 variant &4
The period definition of the ledgers to be switched must match during
the course of the switch project.
The project cannot be activated or continued with the existing
parameters.
Make sure that the defined posting periods for the ledgers to be
switched are the same during the switch. Use shortened fiscal years for
this if necessary. For more information, see SAP Library under <LS>
General Ledger Accounting (FI-GL) </>-> <LS>Configuring General Ledger
Accounting </>-> <LS>Parallel Accounting </>-> <LS>Portrayal Using
Parallel Ledgers </>-> <LS>Change in Leading Valuation </>-> <LS>
Preparation Phase </>-> <LS>Check Prerequisites for Project Start</>.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
FAGL_SWITCH_LEAD_LDG120
- Period end &1 in variant &2 differs from &3 variant &4 ?The SAP error message FAGL_SWITCH_LEAD_LDG120 typically occurs during the period-end closing process in the context of Financial Accounting (FI) and General Ledger (G/L) accounting. This error indicates that there is a mismatch between the variants used for the period-end closing process.
Cause:
The error message FAGL_SWITCH_LEAD_LDG120 is triggered when the system detects that the period-end closing variant specified in the configuration does not match the expected variant for the period being processed. This can happen due to:
- Configuration Issues: The closing variants for different periods may not be aligned or properly configured.
- User Error: A user may have selected the wrong variant for the period-end closing process.
- Changes in Variants: If variants were modified or deleted after they were initially set up, it could lead to discrepancies.
Solution:
To resolve this error, you can take the following steps:
Check Variants: Verify the closing variants configured in the system for the period-end closing process. Ensure that the variants for the current period match the expected variants.
Review Configuration: Go to the configuration settings for the period-end closing process in the SAP system. Check the settings under:
- SPRO ? Financial Accounting ? General Ledger Accounting ? Period-End Closing ? Define Closing Variants. Ensure that the variants for the periods are correctly defined and consistent.
Adjust User Selections: If a user is manually selecting variants, ensure they are using the correct variant for the period being processed.
Consult Documentation: Review any documentation or notes related to the specific closing process you are executing to ensure compliance with the expected procedures.
Testing: If changes are made to the configuration or variants, conduct a test run to ensure that the error does not reoccur.
SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance.
Related Information:
Transaction Codes: Familiarize yourself with relevant transaction codes such as:
Documentation: Refer to SAP Help documentation for detailed guidance on period-end closing processes and variant management.
Support: If the issue persists after following the above steps, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
By following these steps, you should be able to identify and resolve the FAGL_SWITCH_LEAD_LDG120 error effectively.
Get instant SAP help. Start your 7-day free trial now.
FAGL_SWITCH_LEAD_LDG119
Period start &1 in variant &2 differs from &3 variant &4
What causes this issue? The period definition of the ledgers to be switched must match during the course of the switch project.System Response The p...
FAGL_SWITCH_LEAD_LDG118
Leading ledger was reset to &1
What causes this issue? A transport request containing a changed Customizing setting was imported into this system. A ledger different to &V1&am...
FAGL_SWITCH_LEAD_LDG121
Identical fiscal year start for variant &1 &2 in year &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FAGL_SWITCH_LEAD_LDG122
Identical fiscal year end for variant &1 &2 in year &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.