Message type: E = Error
Message class:  FAGL_ORG_UNITS - Error Messages in Area of Master Data 
Message number: 011
Message text: Changing profit center from &1 to &2 is not permitted
You want to change the profit center from &V1& to &V2&. However, this is
<ZH>not</> permitted because transaction data either already exists for
the account assignment object or could exist at the time when the change
takes effect in the system. Changing the profit center in this instance
can lead to inconsistencies in Financial Accounting.
&EXAMPLES&:
There are costs on a cost center (WBS element) to which profit center A
is assigned. If the profit center in the cost center master record were
now changed to B and the costs then distributed to other cost centers,
the currently assigned profit center - that is, profit center B - would
be credited. Profit center A, however, would still have a debit posting.
There are not yet any costs on a cost center to which profit center A is
assigned. For this cost center, an additional time slice needs to be
created for a future period with profit center B.  However, there is
always a chance that transaction data continues to be entered in the
cost center until the time when postings can be made to the affected
period. This can lead to similar inconsistencies as those described in
point 1.
The action is terminated.
Check what effects a change in profit center could have on the
corresponding balance sheet in Financial Accounting.
If you still want the change in profit center to be possible, you can
convert this error message into a warning message. You do this in the
IMG activity <DS:SIMG.SIMG_CFMENUORK3OBA5>Change Message Control</>
(message class <AB>FAGL_ORG_UNITS,</> message<AB>011</>).
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
INCLUDE FAGL_R_MSG_CHANGE_PRCTR OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE.
The SAP error message FAGL_ORG_UNITS011 indicates that there is an issue with changing the profit center for a financial document or transaction. Specifically, the message states that changing the profit center from one value (&1) to another value (&2) is not permitted. This typically occurs in the context of financial postings or adjustments where the profit center is a critical component of the accounting structure.
Cause: Profit Center Assignment Rules: The system has specific rules regarding the assignment of profit centers. Changing a profit center may violate these rules, especially if the document is already posted or if the profit center is linked to certain organizational structures. Document Status: The document may be in a status that does not allow changes, such as being already posted or locked for further changes. Configuration Settings: The configuration settings in the SAP system may restrict changes to profit centers for certain types of transactions or under specific
 Get instant SAP help. Sign up for our Free Essentials Plan.
Get instant SAP help. Sign up for our Free Essentials Plan. 
FAGL_ORG_UNITS009 No segment could be derived
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FAGL_ORG_UNITS008 No functional area found
What causes this issue?  A functional area could not be derived for the current line (account/cost element: &V1&, &V2&, cost center: &...
FAGL_ORG_UNITS012 Hierarchy area cannot be changed
What causes this issue?  The hierarchy area cannot be changed due to areas that exist at lower levels.System Response  The system issues an error mess...
FAGL_ORG_UNITS013 Postings have already been made to profit ctr &1; it cannot be deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.