How To Fix FAGL_LEDGER_CUST153 - Plan data integration is active for secondary cost elements


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FAGL_LEDGER_CUST - New General Ledger: Customizing

  • Message number: 153

  • Message text: Plan data integration is active for secondary cost elements

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FAGL_LEDGER_CUST153 - Plan data integration is active for secondary cost elements ?

    The SAP error message FAGL_LEDGER_CUST153 indicates that plan data integration is active for secondary cost elements in the context of the General Ledger (G/L) accounting. This error typically arises when there is an attempt to post or process transactions involving secondary cost elements while the system is configured to require plan data integration.

    Cause:

    The error occurs due to the following reasons:

    1. Plan Data Integration Active: The system is configured to require plan data integration for secondary cost elements, which means that any postings involving these cost elements must have corresponding plan data.
    2. Missing Plan Data: The transaction being processed does not have the necessary plan data associated with the secondary cost element, leading to the error.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Configuration:

      • Verify the configuration settings for the secondary cost elements in the controlling area. Ensure that the settings for plan data integration are correctly defined.
      • You can check this in the SAP system under the following path:
        • SPRO ? Controlling ? Cost Element Accounting ? Master Data ? Cost Elements ? Define Cost Elements.
    2. Ensure Plan Data Exists:

      • Make sure that plan data exists for the secondary cost elements involved in the transaction. You can do this by checking the planning data in the relevant planning transactions (e.g., KP06 for cost center planning).
      • If plan data is missing, you may need to create or update the plan data for the relevant periods.
    3. Review Transaction:

      • Review the transaction that triggered the error to ensure that it is correctly set up to include the necessary plan data.
      • If the transaction is not supposed to require plan data, you may need to adjust the configuration to deactivate plan data integration for secondary cost elements.
    4. Consult Documentation:

      • Refer to SAP documentation or help resources for more detailed guidance on handling plan data integration and secondary cost elements.
    5. Contact SAP Support:

      • If the issue persists after checking the above points, consider reaching out to SAP support for further assistance, as they can provide more specific guidance based on your system configuration.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as KP06 (Change Plan Data), KSB1 (Cost Centers: Actual Line Items), and FAGLB03 (G/L Account Line Items) to analyze and manage cost elements and plan data.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to FAGL_LEDGER_CUST153 or plan data integration.
    • User Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, providing insights or solutions from other users' experiences.

    By following these steps, you should be able to identify the cause of the FAGL_LEDGER_CUST153 error and implement the necessary solutions to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker