How To Fix FAGL_LEDGER_CUST151 - Plan data integration was activated for secondary cost elements


FAGL_LEDGER_CUST151 - Overview

  • Message type: E = Error

  • Message class: FAGL_LEDGER_CUST - New General Ledger: Customizing

  • Message number: 151

  • Message text: Plan data integration was activated for secondary cost elements

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FAGL_LEDGER_CUST151 - Plan data integration was activated for secondary cost elements ?
    The SAP error message FAGL_LEDGER_CUST151 indicates that plan data integration has been activated for secondary cost elements in the system. This typically occurs when there is an attempt to post or process data related to secondary cost elements in a way that is not compatible with the current configuration of the system.
    
    Cause: Plan Data Integration Activation: The error arises because the system is configured to expect plan data for secondary cost elements, but the necessary data or configuration is missing or incorrect. Posting Issues: It may occur when trying to post actual data to a secondary cost element without the corresponding plan data being available. Configuration Settings: The settings in the controlling area or the cost element master data may not be aligned with the requirements for plan data integration.
    Solution: Check Configuration: Go to the configuration settings in SAP (Transaction SPRO) and navigate to the controlling area settings. Ensure that the settings for plan data integration

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker