How To Fix F5448 - Specify the run date


F5448 - Overview

  • Message type: E = Error

  • Message class: F5 - Document Editing

  • Message number: 448

  • Message text: Specify the run date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message F5448 - Specify the run date ?
    The SAP error message F5448, which states "Specify the run date," typically occurs in the context of financial transactions or processes that require a specific date to be entered for execution. This error is often encountered when trying to execute a financial report, run a batch job, or perform a transaction that requires a date parameter.
    
    Cause: The error is triggered when the system expects a run date to be specified, but it has not been provided. This can happen in various scenarios, such as: Missing Input: The user did not enter a run date in the relevant field. Incorrect Configuration: The program or transaction may be configured to require a run date, but the settings do not allow for it to be automatically populated. User Authorization: The user may not have the necessary permissions to access or modify the date field.
    Solution: To resolve the F5448 error, you can take the following steps: Enter the Run Date:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author