Do you have any question about this error?
Message type: E = Error
Message class: F= -
Message number: 092
Message text: & not possible for plan data
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
F=092
- & not possible for plan data ?The SAP error message F=092 typically indicates an issue related to planning data in the SAP system, particularly in the context of financial planning or budgeting. The message "not possible for plan data" suggests that the operation you are trying to perform is not allowed for planning data, which can occur in various scenarios.
Possible Causes:
- Incorrect Data Type: The operation you are attempting may not be applicable to planning data. For example, certain transactions or reports may only be valid for actual data.
- Authorization Issues: The user may not have the necessary authorizations to perform actions on planning data.
- Configuration Settings: The system configuration may not allow certain operations on planning data, such as posting or changing certain fields.
- Data Locking: The planning data might be locked by another user or process, preventing modifications.
- Version Issues: If you are working with different versions of planning data, ensure that you are accessing the correct version.
Solutions:
- Check Data Type: Ensure that the operation you are trying to perform is valid for planning data. Review the documentation or consult with your SAP functional team.
- Review Authorizations: Verify that you have the necessary authorizations to access and modify planning data. If not, contact your SAP security team to request the appropriate access.
- Configuration Review: Consult with your SAP configuration team to ensure that the system settings allow the operation you are trying to perform on planning data.
- Data Locking: Check if the planning data is locked. If it is, you may need to wait until the lock is released or contact the user who has locked the data.
- Version Check: Make sure you are working with the correct version of the planning data. If necessary, switch to the appropriate version.
Related Information:
KP06
(Cost Center Planning) or CST0
(Cost Planning).If the issue persists after trying the above solutions, it may be beneficial to engage with your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
F=091
Please mark the procedures to be included into the background job
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
F=090
Drill down amounts for period &/& may not match account balances
What causes this issue? Either the drill down preparation for the direct accounts is not yet done or you have changed traced cost or direct postings ...
F=093
You cannot create log entries for reversals in test mode
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
F=094
You cannot create a test mode log for this procedure and status
What causes this issue? You can only create a message log in test mode for the procedure that currently could be processed in production mode as well...
Click on this link to search all SAP messages.