How To Fix ERP_CO_OLC_E082 - Orders with project assignment in operations cannot be budgeted


SAP Error Message - Details

  • Message type: E = Error

  • Message class: ERP_CO_OLC_E - Messages for Operative Level Costing

  • Message number: 082

  • Message text: Orders with project assignment in operations cannot be budgeted

  • Show details Hide details
  • What causes this issue?

    Order operations of order &V1& are assigned to a WBS element. See
    operation &v2& and further operations if necessary.
    This means that the budget is managed on the WBS element, and that the
    business transaction "Budgeting" is prohibited for order &V1&.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    You cannot manage a budget for order &V1&.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message ERP_CO_OLC_E082 - Orders with project assignment in operations cannot be budgeted ?

    The SAP error message ERP_CO_OLC_E082 indicates that there is an issue with budgeting for orders that have a project assignment in operations. This error typically arises in the context of controlling (CO) and project systems (PS) within SAP, particularly when trying to budget or plan costs for an order that is linked to a project.

    Cause:

    The error can occur due to several reasons:

    1. Project Assignment Issues: The order may be assigned to a project that does not have a valid budget or the budget is not sufficient to cover the costs.
    2. Budgeting Configuration: The budgeting configuration for the project or order may not be set up correctly, leading to restrictions on budgeting.
    3. Order Type Restrictions: Certain order types may not allow budgeting if they are linked to projects.
    4. Missing Authorizations: The user may not have the necessary authorizations to perform budgeting operations on the project or order.

    Solution:

    To resolve the error, consider the following steps:

    1. Check Project Budget:

      • Verify that the project assigned to the order has an adequate budget. You can do this by navigating to the project in the Project System (PS) module and checking the budget status.
    2. Review Order Assignment:

      • Ensure that the order is correctly assigned to the project. Check the order details to confirm the project assignment.
    3. Budgeting Configuration:

      • Review the budgeting configuration for the project and the order type. Ensure that the settings allow for budgeting and that there are no restrictions in place.
    4. Authorization Check:

      • Ensure that the user attempting to budget has the necessary authorizations. This can be checked with the security team or by reviewing the user roles in SAP.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific details on budgeting for orders with project assignments. This may provide insights into any additional configuration or settings that need to be adjusted.
    6. SAP Notes:

      • Check for any relevant SAP Notes that may address this specific error message. SAP frequently releases notes that provide fixes or workarounds for known issues.
    7. Contact Support:

      • If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. They can provide more detailed troubleshooting based on your specific system configuration.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJI3 (Project Actual Line Items), and KO22 (Change Order) to help in diagnosing the issue.
    • Budgeting Process: Understanding the budgeting process in SAP, including how budgets are created, monitored, and adjusted, can provide context for resolving this error.
    • Integration with Other Modules: Be aware of how the Controlling (CO) module integrates with the Project System (PS) and how this affects budgeting and cost planning.

    By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant