How To Fix EQ084 - Budget billing plan &2 assigned to contract &1


EQ084 - Overview

  • Message type: E = Error

  • Message class: EQ - Cross-IS-U functions

  • Message number: 084

  • Message text: Budget billing plan &2 assigned to contract &1

  • Show details Hide details
  • What causes this issue?

    <DS:GLOS.3526BE45AFAB52B9E10000009B38F974>Budget billing plan</> &V2&
    exists for <DS:GLOS.3526BE81AFAB52B9E10000009B38F974>contract</> &V1&.
    This plan was not created during move-in processing or does not begin
    until after the <DS:GLOS.3526BDBBAFAB52B9E10000009B38F974>move-in date
    </>.
    As a result, you cannot do the following:
    You cannot reverse the move-in document.
    You cannot change the move-in date.
    You cannot process the budget billing plan from the
    <DS:GLOS.3526BDBAAFAB52B9E10000009B38F974>move-in</>.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Choose one of the following options:
    If you want to reverse the move-in document or change the move-in date,
    you must first <DS:TRAN.E61D>delete</> the budget billing plan.
    If you want to change the budget billing plan, choose the following in
    the menu: <LS>Utilities Industry -> Invoicing -> Budget Billing Plan
    </>.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message EQ084 - Budget billing plan &2 assigned to contract &1 ?
    The SAP error message EQ084 indicates that there is an issue with the budget billing plan assigned to a contract. This error typically arises in the context of SAP IS-U (Industry Solution for Utilities) when there is a problem with the configuration or assignment of budget billing plans to contracts.
    
    Cause: Incorrect Assignment: The budget billing plan may not be correctly assigned to the contract in question. Missing Configuration: The budget billing plan may not be properly configured in the system. Contract Status: The contract may be in a status that does not allow for the assignment of a budget billing plan. Data Inconsistencies: There may be inconsistencies in the master data related to the contract or billing plan.
    Solution: Check Assignment: Verify that the budget billing plan is correctly assigned to the contract. You can do this by navigating to the contract details in the SAP system and checking the billing plan assignment. Review Configuration: Ensure that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author