Message type: E = Error
Message class: EQ - Cross-IS-U functions
Message number: 084
Message text: Budget billing plan &2 assigned to contract &1
<DS:GLOS.3526BE45AFAB52B9E10000009B38F974>Budget billing plan</> &V2&
exists for <DS:GLOS.3526BE81AFAB52B9E10000009B38F974>contract</> &V1&.
This plan was not created during move-in processing or does not begin
until after the <DS:GLOS.3526BDBBAFAB52B9E10000009B38F974>move-in date
</>.
As a result, you cannot do the following:
You cannot reverse the move-in document.
You cannot change the move-in date.
You cannot process the budget billing plan from the
<DS:GLOS.3526BDBAAFAB52B9E10000009B38F974>move-in</>.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Choose one of the following options:
If you want to reverse the move-in document or change the move-in date,
you must first <DS:TRAN.E61D>delete</> the budget billing plan.
If you want to change the budget billing plan, choose the following in
the menu: <LS>Utilities Industry -> Invoicing -> Budget Billing Plan
</>.
Error message extract from SAP system. Copyright SAP SE.
EQ084
- Budget billing plan &2 assigned to contract &1 ?The SAP error message EQ084 indicates that there is an issue with the budget billing plan assigned to a contract. This error typically arises in the context of SAP IS-U (Industry Solution for Utilities) when there is a problem with the configuration or assignment of budget billing plans to contracts.
Cause: Incorrect Assignment: The budget billing plan may not be correctly assigned to the contract in question. Missing Configuration: The budget billing plan may not be properly configured in the system. Contract Status: The contract may be in a status that does not allow for the assignment of a budget billing plan. Data Inconsistencies: There may be inconsistencies in the master data related to the contract or billing plan.
Solution: Check Assignment: Verify that the budget billing plan is correctly assigned to the contract. You can do this by navigating to the contract details in the SAP system and checking the billing plan assignment. Review Configuration: Ensure that
Get instant SAP help. Sign up for our Free Essentials Plan.
EQ083
Move-in reading exists for device &1
What causes this issue? For the specified device, there is a meter reading result with meter reading reason 06 (move-in) on the move-in date of the e...
EQ082
Move-in document &1 has already been reversed for contract &2
What causes this issue? The move-in document has already been cancelled.System Response You cannot change or cancel a move-in document, which has al...
EQ085
Move-in document &1 has already been reversed
What causes this issue? The move-in document has already been cancelled.System Response It is not possible to change or cancel a move-in document th...
EQ086
Installation &2: select a reference from company code &1
What causes this issue? For <DS:GLOS.3526BE49AFAB52B9E10000009B38F974>installation</> &v2&, the default value that was determined...
Click on this link to search all SAP messages.