How To Fix EMV253 - Planned changes to business partner &1 (validity date &2) deleted


EMV253 - Overview

  • Message type: E = Error

  • Message class: EMV - Reserved for IS-U: move-in/out

  • Message number: 253

  • Message text: Planned changes to business partner &1 (validity date &2) deleted

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message EMV253 - Planned changes to business partner &1 (validity date &2) deleted ?
    The SAP error message EMV253 indicates that planned changes to a business partner (BP) have been deleted. This typically occurs in the context of managing business partner data in SAP, particularly when changes are scheduled to take effect on a specific validity date.
    
    Cause: Conflicting Changes: If there are conflicting changes made to the business partner data, the system may delete the planned changes to avoid inconsistencies. Invalid Validity Date: The validity date specified for the planned changes may not be valid or may have been changed, leading to the deletion of the planned changes. Manual Deletion: A user may have manually deleted the planned changes or the changes may have been removed due to a system process. Data Locking: If the business partner data is locked by another user or process, the planned changes may not be able to be saved, resulting in their deletion.
    Solution: Check Validity Dates: Ensure that the validity date for the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker