How To Fix EMV146 - Move-out document &1 is not part of a contract change


EMV146 - Overview

  • Message type: E = Error

  • Message class: EMV - Reserved for IS-U: move-in/out

  • Message number: 146

  • Message text: Move-out document &1 is not part of a contract change

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message EMV146 - Move-out document &1 is not part of a contract change ?
    The SAP error message EMV146, which states "Move-out document &1 is not part of a contract change," typically occurs in the context of contract management and move-out processes in SAP IS-U (Industry Solution for Utilities). This error indicates that the move-out document you are trying to process is not linked to a valid contract change, which is necessary for the operation you are attempting to perform.
    
    Cause: Missing Contract Change: The move-out document may not be associated with a contract change. In SAP, a move-out document should be linked to a contract change to ensure that the changes in the contract are properly reflected in the billing and service management processes. Incorrect Document Status: The status of the move-out document may not allow it to be processed. For example, it might be in a status that does not permit further actions. Data Inconsistencies: There may be inconsistencies in the data related to the contract

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker