How To Fix EL342 - Device &1, register &2, MR date &4: MR date is after scheduled MR date


SAP Error Message - Details

  • Message type: E = Error

  • Message class: EL - IS-U meter reading data processing

  • Message number: 342

  • Message text: Device &1, register &2, MR date &4: MR date is after scheduled MR date

  • Show details Hide details
  • What causes this issue?

    Field <DS:DE.E_ZUKERF>MRD limitation</> in table TE410 controls whether
    a meter reading result may be entered for the future. This field is set
    to value &v3&.

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    System Response

    How to fix this error?


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message EL342 - Device &1, register &2, MR date &4: MR date is after scheduled MR date ?

    The SAP error message EL342 indicates that there is a mismatch between the Material Receipt (MR) date and the scheduled MR date for a specific device and register. This error typically arises in the context of logistics or inventory management, particularly when dealing with materials or equipment that have specific scheduling requirements.

    Cause:

    The error occurs when:

    • The Material Receipt date (MR date) you are trying to enter is later than the scheduled MR date for the device and register specified.
    • This can happen due to incorrect data entry, changes in scheduling, or delays in the receipt of materials.

    Solution:

    To resolve the EL342 error, you can take the following steps:

    1. Check Scheduled MR Date: Verify the scheduled MR date for the device and register in question. This can usually be found in the relevant transaction or report in SAP.

    2. Adjust MR Date: If the MR date you are trying to enter is indeed later than the scheduled date, you will need to either:

      • Change the MR date to a date that is on or before the scheduled MR date.
      • If the MR date needs to be later due to valid reasons (e.g., delays in delivery), you may need to update the scheduled MR date in the system to reflect the new timeline.
    3. Review Configuration: If this issue occurs frequently, review the configuration settings related to scheduling and material receipts to ensure they align with your operational processes.

    4. Consult Documentation: Refer to SAP documentation or help resources for more detailed information on handling material receipts and scheduling.

    5. Contact Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as ME21N (Create Purchase Order), ME22N (Change Purchase Order), and MIGO (Goods Movement) to manage material receipts effectively.
    • User Roles: Ensure that you have the appropriate permissions to make changes to scheduled dates and material receipts.
    • Training: Consider training sessions for users involved in logistics and inventory management to minimize errors related to scheduling and material receipts.

    By following these steps, you should be able to address the EL342 error and ensure that your material receipt processes run smoothly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant