Message type: E = Error
Message class: EHQ - QM: Messages
Message number: 029
Message text: Error occurred changing the plan header &1 &2
The inspection plan could not be changed.
Task list group: &V1&
Group counter: &V2&
Error message extract from SAP system. Copyright SAP SE.
EHQ029
- Error occurred changing the plan header &1 &2 ?The SAP error message EHQ029, which states "Error occurred changing the plan header &1 &2," typically occurs in the context of planning and scheduling within SAP, particularly in modules related to production planning or project management. This error indicates that there was an issue when attempting to change the header of a planning document, such as a production order, project, or maintenance plan. Possible Causes: Data Inconsistency: There may be inconsistencies in the data related to the planning document, such as missing or incorrect entries in required fields. Authorization Issues: The user may not have the necessary authorizations to make changes to the plan header. System Lock: The document may be locked by another user or process, preventing changes from being made.
Configuration Issues: There may be configuration settings in the system that are preventing the change from being processed. Technical Errors: There could be underlying technical issues, such as database problems or issues with the
Get instant SAP help. Sign up for our Free Essentials Plan.
EHQ028
A number of plans were found; the first will be changed
What causes this issue? A number of inspection plans were found that are potential candidates for change.System Response The first of the inspection...
EHQ027
Inspection plan operations could not be locked
What causes this issue? The inspection plan operation may contain errors.Error message extract from SAP system. Copyright SAP SE. ...
EHQ030
Error occurred creating the plan header
System Response The inspection plan header could not be created.Error message extract from SAP system. Copyright SAP SE. ...
EHQ031
Only the first plan header will be changed
What causes this issue? An error occurred selecting inspection plans: more than one plan was selected.System Response The first of the selected plan...
Click on this link to search all SAP messages.