How To Fix EHQ029 - Error occurred changing the plan header &1 &2


EHQ029 - Overview

  • Message type: E = Error

  • Message class: EHQ - QM: Messages

  • Message number: 029

  • Message text: Error occurred changing the plan header &1 &2

  • Show details Hide details
  • System Response

    The inspection plan could not be changed.
    Task list group: &V1&
    Group counter: &V2&

    Error message extract from SAP system. Copyright SAP SE.


EHQ029 - Details

  • The SAP error message EHQ029, which states "Error occurred changing the plan header &1 &2," typically occurs in the context of planning and scheduling within SAP, particularly in modules related to production planning or project management. This error indicates that there was an issue when attempting to change the header of a planning document, such as a production order, project, or maintenance plan.
    Possible Causes:
    
    Data Inconsistency: There may be inconsistencies in the data related to the planning document, such as missing or incorrect entries in required fields.
    Authorization Issues: The user may not have the necessary authorizations to make changes to the plan header.
    System Lock: The document may be locked by another user or process, preventing changes from being made.
    
    Configuration Issues: There may be configuration settings in the system that are preventing the change from being processed. Technical Errors: There could be underlying technical issues, such as database problems or issues with the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


EHQ029 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker