How To Fix EHPRC_CPM_EXP_IMDS255 - Unit &1 does not correspond to dimension &2


EHPRC_CPM_EXP_IMDS255 - Overview

  • Message type: E = Error

  • Message class: EHPRC_CPM_EXP_IMDS - Messages Export - IMDS Integration

  • Message number: 255

  • Message text: Unit &1 does not correspond to dimension &2

  • Show details Hide details
  • What causes this issue?

    Bulks and basic materials can be nested. However, the unit must match
    the dimension.
    If a product contains a basic material or a bulk in the composition, the
    unit has to be in grams on the first level and percent on further
    levels. Other units of the same dimension can be used too.
    If a bulk contains a basic material, the unit has to be percent or a
    unit with the same dimension.

    System Response

    The system stopped processing.

    How to fix this error?

    Check the product structure for nested basic materials and bulks.
    Note: A basic material in a composition of a bulk needs percent as unit.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message EHPRC_CPM_EXP_IMDS255 - Unit &1 does not correspond to dimension &2 ?
    The SAP error message EHPRC_CPM_EXP_IMDS255 indicates that there is a mismatch between a unit of measure and a dimension in the context of the IMDS (International Material Data System) integration within SAP. This error typically arises when the system expects a certain unit of measure for a specific dimension, but the provided unit does not match the expected one.
    
    Cause: Unit of Measure Mismatch: The unit of measure assigned to a material or component does not correspond to the expected dimension. For example, if a dimension is expected to be in meters but is provided in centimeters, this error may occur.
    Configuration Issues: There may be incorrect settings in the material master data or in the IMDS configuration that lead to this mismatch. Data Entry Errors: Manual data entry errors can lead to incorrect units being assigned to dimensions.
    Solution: Check Material Master Data: Review the material master data for the affected unit and dimension. Ensure

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker