How To Fix EHPRC_CPM_BOMBOS108 - Report not executed before; specify start date


SAP Error Message - Details

  • Message type: E = Error

  • Message class: EHPRC_CPM_BOMBOS - Messages for BOMBOS Interface

  • Message number: 108

  • Message text: Report not executed before; specify start date

  • Show details Hide details
  • What causes this issue?

    You have omitted the start date <LB><LS>Include Changes Since</></>,
    which is mandatory for the first execution of the supplier change
    monitor.
    The system checks all changes between the current runtime and the last
    runtime or the manually entered start date.

    System Response

    The report is not executed.

    How to fix this error?

    Specify a start date and execute the report again.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message EHPRC_CPM_BOMBOS108 - Report not executed before; specify start date ?

    The SAP error message EHPRC_CPM_BOMBOS108 typically indicates that a report has not been executed before, and the system requires a start date to proceed. This error is often encountered in the context of the SAP EH&S (Environment, Health, and Safety) module, particularly when dealing with reports related to chemical management or product safety.

    Cause:

    1. Initial Execution Requirement: The report you are trying to run has not been executed previously, and the system needs a start date to generate the report.
    2. Missing Configuration: There may be a configuration issue where the report settings do not allow for execution without a specified start date.
    3. Data Availability: The report may require historical data that is not available if it has never been executed.

    Solution:

    1. Specify a Start Date: When prompted, enter a valid start date for the report execution. This date should correspond to the period for which you want to generate the report.
    2. Check Report Configuration: Review the configuration settings for the report in the SAP system to ensure that it is set up correctly to allow execution without prior runs if that is desired.
    3. Run a Preliminary Report: If applicable, run a preliminary report or a related report that may initialize the data required for the main report.
    4. Consult Documentation: Refer to the SAP documentation or help files related to the specific report to understand any prerequisites or required settings.
    5. Contact Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert who can provide insights based on your specific system configuration.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • User Authorization: Ensure that you have the necessary authorizations to execute the report, as sometimes restrictions can lead to unexpected errors.
    • System Logs: Review system logs for any additional error messages or warnings that may provide more context about the issue.

    By following these steps, you should be able to resolve the error and successfully execute the report in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant