Message type: E = Error
Message class: EDATEX - Messages for Data Exchange Processes
Message number: 039
Message text: Choose due date control with suitable type of reference period
The type of reference period for the due date control does not
correspond to the type of reference period for the DATEX basic process.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
EDATEX039
- Choose due date control with suitable type of reference period ?The SAP error message EDATEX039, which states "Choose due date control with suitable type of reference period," typically occurs in the context of the SAP system when dealing with due date control settings in the context of financial or logistics processes. This error indicates that the system is unable to determine a suitable due date control method based on the reference period you have selected.
Cause: Incompatible Reference Period: The reference period you have chosen does not match the expected type for the due date control. This can happen if the reference period is not defined correctly in the system or if it does not align with the due date control settings.
Configuration Issues: There may be configuration issues in the SAP system related to the due date control settings. This could involve missing or incorrect entries in the customizing settings. Data Entry Errors: Incorrect data entry in the transaction or master data that
Get instant SAP help. Sign up for our Free Essentials Plan.
EDATEX038
Choose due date control with cyclical due dates
What causes this issue? You have allocated a due date control with event-related due dates to DATEX process &v1& of the DATEX definition. DAT...
EDATEX037
Data exchange format &1 is not permitted for basic process &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EDATEX040
Choose due date control without specifying reference period
What causes this issue? For DATEX process &v1& you have chosen <DS:DE.E_DEXSCHEDTYPE>asynchronous</> data sending. If you choose ...
EDATEX041
Define a reference period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.