How To Fix EB041 - Data inconsistency: Budget billing plan &1 incomplete


SAP Error Message - Details

  • Message type: E = Error

  • Message class: EB - IS-U invoicing

  • Message number: 041

  • Message text: Data inconsistency: Budget billing plan &1 incomplete

  • Show details Hide details
  • What causes this issue?

    The budget billing plan for document number &V1& is not complete.

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    System Response

    Invoicing cannot be processed.

    How to fix this error?

    INCLUDE ISU_SAP OBJECT DOKU ID TX

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message EB041 - Data inconsistency: Budget billing plan &1 incomplete ?

    The SAP error message EB041, which states "Data inconsistency: Budget billing plan &1 incomplete," typically occurs in the context of budget billing plans in SAP IS-U (Industry Solution for Utilities). This error indicates that there is an inconsistency in the data related to a budget billing plan, which may be due to missing or incomplete information.

    Causes:

    1. Incomplete Data Entry: The budget billing plan may not have all the required fields filled out, such as billing frequency, amounts, or other relevant details.
    2. Data Corruption: There may be issues with the underlying data in the database, leading to inconsistencies.
    3. Configuration Issues: Incorrect configuration settings in the budget billing plan or related modules may lead to this error.
    4. Missing Master Data: Related master data (like customer master data or contract accounts) may be incomplete or missing.

    Solutions:

    1. Check Budget Billing Plan: Review the budget billing plan referenced in the error message. Ensure that all required fields are filled out correctly and completely.
    2. Review Related Master Data: Check the associated customer and contract account master data for completeness and correctness.
    3. Recreate the Budget Billing Plan: If the plan is found to be corrupted or incomplete, consider deleting and recreating it.
    4. Consult Configuration Settings: Verify the configuration settings for budget billing plans in the SAP system to ensure they are set up correctly.
    5. Run Consistency Checks: Use transaction codes like SE38 or SA38 to run any relevant reports or programs that can check for data consistency in budget billing plans.
    6. SAP Notes and Support: Check for any relevant SAP Notes that may address this specific error or provide patches. If necessary, contact SAP support for assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as:
      • FPL9: Display Budget Billing Plan
      • FPL1: Create Budget Billing Plan
      • FPL2: Change Budget Billing Plan
    • Documentation: Review SAP documentation related to budget billing plans and IS-U for detailed information on required fields and configurations.
    • User Roles: Ensure that the user has the necessary authorizations to create or modify budget billing plans.

    By following these steps, you should be able to identify and resolve the issue causing the EB041 error message in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker