How To Fix EAMS_BO167 - Backward scheduling; system date set as end date


EAMS_BO167 - Overview

  • Message type: E = Error

  • Message class: EAMS_BO - Business Object Layer

  • Message number: 167

  • Message text: Backward scheduling; system date set as end date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


EAMS_BO167 - Details

  • The SAP error message EAMS_BO167, which states "Backward scheduling; system date set as end date," typically occurs in the context of scheduling operations in SAP, particularly in the areas of project management, production planning, or maintenance planning. This error indicates that the system is attempting to schedule a task or operation backward from a specified end date, but the system date (current date) is being used as the end date, which can lead to scheduling conflicts or inconsistencies.
    
    Cause: System Date as End Date: The error arises when the system date is set as the end date for a scheduling operation, which is not feasible for backward scheduling. Backward scheduling requires a future end date to calculate the start date. Incorrect Configuration: There may be incorrect settings in the scheduling parameters or project definitions that lead to the system date being used incorrectly. Missing or Incorrect Dates: The task or operation may not have

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


EAMS_BO167 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant